What's changing near BD13 5BX
Within 2 km, around Cullingworth & Denholme in Bradford. Building, planning, schools, transport, prices and crime.
35new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+5.3%like-for-like prices in Cullingworth & Denholme, 2024 → 2025 (council +5.1%)
-3%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
12 new homes completedhouses · Feb 2025 – Jul 2026
Jul 2026
500 m away - New homes
9 new homes completedhouses · Feb 2025 – Dec 2025
Dec 2025
600 m away - New homes
8 new homes completedhouses · Nov 2024
Dec 2024
700 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
7homes extended 2021–2025, typically adding 42 m²
8since energy certificates began (2008)
0in BD13 5BX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
288hours of spills in 2025 between them (typical neighbourhood: about 36)
84spill events counted
- Yorkshire Water
Denholme Whalley Lane Sew Pmpg Stninto Denholme Beck59 spills, 223 hours in 2025
1.5 km away - Yorkshire Water
Harden Road Csointo Wilsden Beck16 spills, 34 hours in 2025
1.9 km away - Yorkshire Water
Bingley Road Csointo Cow House Beck9 spills, 31 hours in 2025
850 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
30 planned, approved or being built and 1 running (18 MW between them). Those within 5 km are on the map above.
- Battery storage
Lane Side - Energy StorageApproved, not yet built · 100 MW
Jul 2025
2.0 km away - Battery storage
Peat Dykes Farm, Harrop Lane - Battery Energy Storage SystemApproved, not yet built · 100 MW
Jun 2026
2.5 km away - Battery storage
Bradford West, Harrop Lane, Wilsden - Battery StorageApproved, not yet built · 100 MW
May 2023
2.5 km away - Battery storage
Old Allen Road, Wilsden - Battery Energy Storage SystemPlanning application in · 100 MW
Oct 2025
2.6 km away - Battery storage
Bradford West Substation (Harrop Edge Farm)Being built · 50 MW
Jul 2022
2.6 km away - Rooftop solar
Universal Av Services, Horizon House - Solar PanelsApproved, not yet built · 180 kW
Oct 2022
4.6 km away - Rooftop solar
James Walker Moorflex - Solar PanelsApproved, not yet built
Aug 2022
4.7 km away - Rooftop solar
Sainsburys Centre, Cavendish Street - Solar PanelsApproved, not yet built · 720 kW
May 2026
5.1 km away - Battery storage
Dalton LaneApproved, not yet built
Oct 2020
5.1 km away - Rooftop solar
St James Church Primary School, Chelwood Drive - Solar Photovoltaic PanelsApproved, not yet built · 150 kW
Jan 2024
5.2 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
10.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.