What's changing near BD13 1PA
Within 2 km, around Queensbury in Bradford. Building, planning, schools, transport, prices and crime.
6new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+4.4%like-for-like prices in Queensbury, 2024 → 2025 (council +5.1%)
-4%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
15homes extended 2021–2025, typically adding 25 m²
25since energy certificates began (2008)
1in BD13 1PA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
125hours of spills in 2025 between them (typical neighbourhood: about 36)
60spill events counted
- Yorkshire Water
Shibden Head Spsinto Shibden Brook38 spills, 105 hours in 2025
2.0 km away - Yorkshire Water
Hillcrest Road No 2 Csointo Trib Of Shibden Brook14 spills, 15 hours in 2025
700 m away - Yorkshire Water
Shibden Head Spsinto Shibden Brook4 spills, 5 hours in 2025
1.4 km away - Yorkshire Water
West Scholes Csointo High Birks Beck4 spills, 2 hours in 2025
1.5 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
41 planned, approved or being built and 2 running (19 MW between them). Those within 5 km are on the map above.
- Battery storage
Holmfield - Battery Energy StorageBeing built · 250 kW
Mar 2023
1.7 km away - Battery storage
Holmfield Battery StorageApproved, not yet built · 500 MW
May 2025
2.2 km away - Biomass
Ernest Gill And Son, Holmfield Industrial Estate - Biomass BoilerApproved, not yet built · 190 kW
Sept 2022
2.2 km away - Battery storage
Holmfield Industrial Estate - Energy Storage FacilityApproved, not yet built
Oct 2025
2.2 km away - Rooftop solar
Clayton Ce Primary School - Solar PanelsApproved, not yet built · 200 kW
Jan 2024
2.6 km away - Rooftop solar
St James Church Primary School, Chelwood Drive - Solar Photovoltaic PanelsApproved, not yet built · 150 kW
Jan 2024
3.3 km away - Battery storage
Old Allen Road, Wilsden - Battery Energy Storage SystemPlanning application in · 100 MW
Oct 2025
4.4 km away - Battery storage
Peat Dykes Farm, Harrop Lane - Battery Energy Storage SystemApproved, not yet built · 100 MW
Jun 2026
4.6 km away - Battery storage
Bradford West Substation (Harrop Edge Farm)Being built · 50 MW
Jul 2022
4.6 km away - Battery storage
Stor Generation Plant - Battery StorageApproved, not yet built · 12 MW
Apr 2025
4.6 km away
Road and street works within 1 km
3 permitted works running now or planned.
- Standard
Deanstones Lane, BradfordNew service connection · YORKSHIRE WATER · Two-way signals
Oct 2026 to Oct 2026
600 m away - Standard
Deanstones Lane, BradfordDisconnection or alteration of supply · NORTHERN POWERGRID (YORKSHIRE) PLC · No carriageway incursion
Oct 2026 to Oct 2026
600 m away - Minor
Albert Road, BradfordUtility repair and maintenance works · VIRGIN MEDIA · Two-way signals
Oct 2026 to Oct 2026
250 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
14.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Ovenden Moor (Repower) (wind farm, 5.9 km); Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 9.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.