Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
357hours of spills in 2025 between them (typical neighbourhood: about 36)
143spill events counted
Yorkshire Water
Green End No 2 Csointo Trib Of Clayton Beck (Culvert)13 spills, 125 hours in 2025
1.6 km away
Yorkshire Water
Thearne Green Csointo Bull Greave Beck55 spills, 104 hours in 2025
1.6 km away
Yorkshire Water
Pasture Lane No 2 Csointo Bull Greave Beck (Culverted)37 spills, 79 hours in 2025
1.8 km away
Yorkshire Water
Edge End Lane Csointo Blackshaw Beck16 spills, 23 hours in 2025
1.9 km away
Yorkshire Water
Hillcrest Road No 2 Csointo Trib Of Shibden Brook14 spills, 15 hours in 2025
43 planned, approved or being built and 2 running (19 MW between them). Those within 5 km are on the map above.
Rooftop solar
Clayton Ce Primary School - Solar PanelsApproved, not yet built · 200 kW
Jan 2024 1.6 km away
Rooftop solar
St James Church Primary School, Chelwood Drive - Solar Photovoltaic PanelsApproved, not yet built · 150 kW
Jan 2024 2.9 km away
Battery storage
Holmfield - Battery Energy StorageBeing built · 250 kW
Mar 2023 3.0 km away
Battery storage
Holmfield Battery StorageApproved, not yet built · 500 MW
May 2025 3.4 km away
Biomass
Ernest Gill And Son, Holmfield Industrial Estate - Biomass BoilerApproved, not yet built · 190 kW
Sept 2022 3.4 km away
Battery storage
Holmfield Industrial Estate - Energy Storage FacilityApproved, not yet built
Oct 2025 3.5 km away
Battery storage
Stor Generation Plant - Battery StorageApproved, not yet built · 12 MW
Apr 2025 3.5 km away
Rooftop solar
Morrisons, Thornton Road - Solar PV PanelsApproved, not yet built · 900 kW
Mar 2022 3.8 km away
Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar PanelsApproved, not yet built · 260 kW
Apr 2024 4.1 km away
Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar panelsApproved, not yet built · 160 kW
Jul 2024 4.1 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 15.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Queensbury: +31% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.5% in two years.