Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
918hours of spills in 2025 between them (typical neighbourhood: about 36)
236spill events counted
Yorkshire Water
Wyke Beck Csointo Bottom Hall Beck72 spills, 357 hours in 2025
1.9 km away
Yorkshire Water
Red Lion A58 Csointo Wyke Beck73 spills, 257 hours in 2025
1.4 km away
Yorkshire Water
Coley Beck Csointo Not Matched In Ea Consents Database50 spills, 173 hours in 2025
1.9 km away
Yorkshire Water
Victoria Park Csointo Low Moor Beck (Culverted)26 spills, 115 hours in 2025
1.5 km away
Yorkshire Water
Bailiff Bridge Csointo Wyke Beck15 spills, 16 hours in 2025
1.6 km away
Yorkshire Water
Common Road Csointo Tributary Of Low Moor Beck0 spills, 0 hours in 2025
55 planned, approved or being built and 2 running (10 MW between them). Those within 5 km are on the map above.
Rooftop solar
Appleton Academy, Woodside Road - Solar PanelsApproved, not yet built · 230 kW
Nov 2024 400 m away
Rooftop solar
Sedbergh Sports and Leisure Centre - Solar PV InstallationBeing built · 200 kW
Mar 2026 2.3 km away
Rooftop solar
Roydsdale Way, Unit 6 - Solar PanelApproved, not yet built · 2 MW
Mar 2026 2.4 km away
Rooftop solar
St Matthews CE Primary School, Ivy House Road - Solar PanelsPlanning application in · 180 kW
Jun 2026 3.4 km away
Rooftop solar
Swaledale House, Weaverthorpe Road - Solar PanelsApproved, not yet built · 2 MW
Aug 2023 4.4 km away
Rooftop solar
Bradford Forster Academy - Solar PanelsApproved, not yet built · 380 kW
Mar 2024 5.1 km away
Rooftop solar
Trafalgar House Police Station - Installation Of Solar PV SystemBeing built
Sept 2023 5.4 km away
Rooftop solar
Bow Beck Bowling, Back Lane - Solar PanelsApproved, not yet built · 180 kW
Jun 2023 5.7 km away
Rooftop solar
University of Bradford, Richmond Road - Solar PanelsApproved, not yet built · 400 kW
Nov 2022 5.7 km away
Battery storage
Ashday Hall Farm, Ashday Lane - Battery Energy StorageApproved, not yet built · 65 MW
Mar 2025 5.8 km away
Road and street works within 1 km
13 permitted works running now or planned, 6 of them major.
Major, planned
High Fernley Road, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Feb 2027 to Mar 2027 400 m away
Major
High Fernley Road, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Feb 2027 to Mar 2027 400 m away
Major
High Fernley Road, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Feb 2027 to Feb 2027 500 m away
Major
Wycoller Road, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Mar 2027 to Mar 2027 750 m away
Major
Whitehall Road, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Aug 2026 to Oct 2026 850 m away
Major
Griffe Road, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Sept 2026 to Oct 2026 950 m away
Standard
Beverley Drive, BradfordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Oct 2026 to Oct 2026 300 m away
Standard
Wilson Road, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Mar 2027 to Mar 2027 400 m away
Standard
Huddersfield Road, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Mar 2027 to Mar 2027400 m away
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 20.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Wyke: +35% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.4% in two years.