What's changing near BD12 7HX
Within 2 km, around Bierley & Tong in Bradford. Building, planning, schools, transport, prices and crime.
259new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+7.4%like-for-like prices in Bierley & Tong, 2024 → 2025 (council +5.1%)
-7%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
39 new homes completedhouses · Feb 2026 – Oct 2026
Oct 2026
1.4 km away - New homes
24 new homes completedhouses · Dec 2025 – Oct 2026
Oct 2026
1.7 km away - New homes
10 new homes completedhouses · Dec 2025 – Sep 2026
Sept 2026
1.8 km away - New homes
5 new homes completedhouses · May 2026 – Sep 2026
Sept 2026
1.7 km away - New homes
33 new homes completedhouses · Apr 2026 – Aug 2026
Aug 2026
1.9 km away - New homes
25 new homes completedhouses · Aug 2025 – Aug 2026
Aug 2026
1.9 km away - New homes
27 new homes completedhouses · May 2026
Jun 2026
1.8 km away - New homes
5 new homes completedhouses · Jun 2026
Jun 2026
1.2 km away - New homes
8 new homes completedhouses · Mar 2026 – Jun 2026
Jun 2026
1.5 km away - New homes
9 new homes completedhouses · Mar 2026 – May 2026
May 2026
1.9 km away - New homes
5 new homes completedhouses · Apr 2026
Apr 2026
1.5 km away - New homes
12 new homes completedhouses · Feb 2026
Mar 2026
1.5 km away
1homes extended 2021–2025, typically adding 30 m²
4since energy certificates began (2008)
1in BD12 7HX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
343hours of spills in 2025 between them (typical neighbourhood: about 36)
124spill events counted
- Yorkshire Water
Carr Hill Road Csointo High Royds Beck50 spills, 127 hours in 2025
100 m away - Yorkshire Water
Victoria Park Csointo Low Moor Beck (Culverted)26 spills, 115 hours in 2025
1.0 km away - Yorkshire Water
North Bierley Csointo Hunsworth Beck12 spills, 40 hours in 2025
900 m away - Yorkshire Water
Shetcliffe Lane No 2 Csointo High Royds Beck21 spills, 28 hours in 2025
1.6 km away - Yorkshire Water
Hunsworth Lane No 2 Csointo Hunsworth Upper Lane Beck10 spills, 22 hours in 2025
1.7 km away - Yorkshire Water
Cliff Hollins Lane Csointo Highroyds Beck3 spills, 10 hours in 2025
650 m away - Yorkshire Water
Raikes Lane Csointo High Royds Beck2 spills, 3 hours in 2025
1.8 km away - Yorkshire Water
New Street Csointo High Royds Beck0 spills, 0 hours in 2025
250 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
54 planned, approved or being built and 2 running (2 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Roydsdale Way, Unit 6 - Solar PanelApproved, not yet built · 2 MW
Mar 2026
500 m away - Rooftop solar
Swaledale House, Weaverthorpe Road - Solar PanelsApproved, not yet built · 2 MW
Aug 2023
2.0 km away - Rooftop solar
Sedbergh Sports and Leisure Centre - Solar PV InstallationBeing built · 200 kW
Mar 2026
2.1 km away - Rooftop solar
St Matthews CE Primary School, Ivy House Road - Solar PanelsPlanning application in · 180 kW
Jun 2026
2.6 km away - Rooftop solar
Appleton Academy, Woodside Road - Solar PanelsApproved, not yet built · 230 kW
Nov 2024
2.7 km away - Rooftop solar
Bradford Forster Academy - Solar PanelsApproved, not yet built · 380 kW
Mar 2024
3.4 km away - Rooftop solar
Bow Beck Bowling, Back Lane - Solar PanelsApproved, not yet built · 180 kW
Jun 2023
4.2 km away - Rooftop solar
Trafalgar House Police Station - Installation Of Solar PV SystemBeing built
Sept 2023
4.4 km away - Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityPlanning application in
May 2024
4.5 km away - Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityApproved, not yet built
Nov 2024
4.5 km away
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
21.9 km away - Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M). application due February 2028
29.5 km away - Decideddecided Oct 2015
29.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 8.2 km); Soothills Landfill (landfill gas, 9.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.