Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
351hours of spills in 2025 between them (typical neighbourhood: about 36)
141spill events counted
Yorkshire Water
Carr Hill Road Csointo High Royds Beck50 spills, 127 hours in 2025
250 m away
Yorkshire Water
Victoria Park Csointo Low Moor Beck (Culverted)26 spills, 115 hours in 2025
850 m away
Yorkshire Water
North Bierley Csointo Hunsworth Beck12 spills, 40 hours in 2025
850 m away
Yorkshire Water
Shetcliffe Lane No 2 Csointo High Royds Beck21 spills, 28 hours in 2025
1.8 km away
Yorkshire Water
Hunsworth Lane No 2 Csointo Hunsworth Upper Lane Beck10 spills, 22 hours in 2025
1.8 km away
Yorkshire Water
Cliff Hollins Lane Csointo Highroyds Beck3 spills, 10 hours in 2025
850 m away
Yorkshire Water
Cleckheaton Road Csointo Tributary Of Low Moor Beck17 spills, 8 hours in 2025
2.0 km away
Yorkshire Water
Raikes Lane Csointo High Royds Beck2 spills, 3 hours in 2025
56 planned, approved or being built and 2 running (2 MW between them). Those within 5 km are on the map above.
Rooftop solar
Roydsdale Way, Unit 6 - Solar PanelApproved, not yet built · 2 MW
Mar 2026 550 m away
Rooftop solar
Sedbergh Sports and Leisure Centre - Solar PV InstallationBeing built · 200 kW
Mar 2026 2.1 km away
Rooftop solar
Swaledale House, Weaverthorpe Road - Solar PanelsApproved, not yet built · 2 MW
Aug 2023 2.2 km away
Rooftop solar
Appleton Academy, Woodside Road - Solar PanelsApproved, not yet built · 230 kW
Nov 2024 2.6 km away
Rooftop solar
St Matthews CE Primary School, Ivy House Road - Solar PanelsPlanning application in · 180 kW
Jun 2026 2.6 km away
Rooftop solar
Bradford Forster Academy - Solar PanelsApproved, not yet built · 380 kW
Mar 2024 3.5 km away
Rooftop solar
Bow Beck Bowling, Back Lane - Solar PanelsApproved, not yet built · 180 kW
Jun 2023 4.3 km away
Rooftop solar
Trafalgar House Police Station - Installation Of Solar PV SystemBeing built
Sept 2023 4.5 km away
Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityPlanning application in
May 2024 4.6 km away
Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityApproved, not yet built
Nov 2024 4.6 km away
Road and street works within 1 km
1 permitted works running now or planned.
Minor
Bradford Road, BradfordUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 21.8 km away
Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Bierley & Tong: +36% over five years (2020 → 2025).
Council tax list: 80 homes added in the neighbourhood since April 2024.
Population (GP registrations): +2.2% in two years.