What's changing near BD12 0JD
Within 2 km, around Low Moor in Bradford. Building, planning, schools, transport, prices and crime.
218new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.3%like-for-like prices in Low Moor, 2024 → 2025 (council +5.1%)
+14%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
39 new homes completedhouses · Feb 2026 – Oct 2026
Oct 2026
1.9 km away - New homes
33 new homes completedhouses · Apr 2026 – Aug 2026
Aug 2026
1.3 km away - New homes
25 new homes completedhouses · Aug 2025 – Aug 2026
Aug 2026
1.2 km away - New homes
27 new homes completedhouses · May 2026
Jun 2026
1.2 km away - New homes
5 new homes completedhouses · Jun 2026
Jun 2026
1.8 km away - New homes
8 new homes completedhouses · Mar 2026 – Jun 2026
Jun 2026
1.8 km away - New homes
9 new homes completedhouses · Mar 2026 – May 2026
May 2026
1.3 km away - New homes
5 new homes completedhouses · Apr 2026
Apr 2026
1.8 km away - New homes
12 new homes completedhouses · Feb 2026
Mar 2026
1.8 km away - New homes
14 new homes completedhouses · Feb 2026
Mar 2026
1.9 km away - New homes
12 new homes completedhouses · Jan 2026 – Feb 2026
Feb 2026
1.4 km away - New homes
5 new homes completedhouses · Nov 2025
Dec 2025
1.2 km away - New homes
12homes extended 2021–2025, typically adding 26 m²
25since energy certificates began (2008)
4in BD12 0JD itself
- Extendedcertificate 2025
- Extendedcertificate 2023
- Extendedcertificate 2020
- Extendedcertificate 2016
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
250hours of spills in 2025 between them (typical neighbourhood: about 36)
93spill events counted
- Yorkshire Water
Carr Hill Road Csointo High Royds Beck50 spills, 127 hours in 2025
1.7 km away - Yorkshire Water
Victoria Park Csointo Low Moor Beck (Culverted)26 spills, 115 hours in 2025
950 m away - Yorkshire Water
Cleckheaton Road Csointo Tributary Of Low Moor Beck17 spills, 8 hours in 2025
550 m away - Yorkshire Water
Common Road Csointo Tributary Of Low Moor Beck0 spills, 0 hours in 2025
500 m away - Yorkshire Water
Upper Park House Csointo Low Moor Beck0 spills, 0 hours in 2025
600 m away - Yorkshire Water
Rooley Avenue Csointo Dean Beck0 spills, 0 hours in 2025
1.4 km away - Yorkshire Water
Smith Avenue Csointo Tributary Of Low Moor Beck0 spills, 0 hours in 2025
1.5 km away - Yorkshire Water
New Street Csointo High Royds Beck0 spills, 0 hours in 2025
1.7 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
56 planned, approved or being built and 1 running (800 kW between them). Those within 5 km are on the map above.
- Rooftop solar
Sedbergh Sports and Leisure Centre - Solar PV InstallationBeing built · 200 kW
Mar 2026
750 m away - Rooftop solar
Roydsdale Way, Unit 6 - Solar PanelApproved, not yet built · 2 MW
Mar 2026
1.3 km away - Rooftop solar
Appleton Academy, Woodside Road - Solar PanelsApproved, not yet built · 230 kW
Nov 2024
1.6 km away - Rooftop solar
St Matthews CE Primary School, Ivy House Road - Solar PanelsPlanning application in · 180 kW
Jun 2026
1.8 km away - Rooftop solar
Swaledale House, Weaverthorpe Road - Solar PanelsApproved, not yet built · 2 MW
Aug 2023
3.1 km away - Rooftop solar
Bradford Forster Academy - Solar PanelsApproved, not yet built · 380 kW
Mar 2024
3.6 km away - Rooftop solar
Trafalgar House Police Station - Installation Of Solar PV SystemBeing built
Sept 2023
3.8 km away - Rooftop solar
Bow Beck Bowling, Back Lane - Solar PanelsApproved, not yet built · 180 kW
Jun 2023
4.1 km away - Rooftop solar
University of Bradford, Richmond Road - Solar PanelsApproved, not yet built · 400 kW
Nov 2022
4.2 km away - Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityPlanning application in
May 2024
4.5 km away
Road and street works within 1 km
7 permitted works running now or planned.
- Standard
First Street, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Jan 2027 to Feb 2027
100 m away - Standard
Cleckheaton Road, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Jan 2027 to Feb 2027
300 m away - Standard
Brighouse Road, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Jan 2027 to Jan 2027
400 m away - Standard
New Works Road, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Dec 2026 to Dec 2026
600 m away - Standard
Common Road, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Jan 2027 to Jan 2027
650 m away - Standard
Common Road, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Nov 2026 to Dec 2026
950 m away - Minor
Wesley Avenue, BradfordRemedial works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026
400 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
20.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 8.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.