What's changing near BD10 8BW
Within 2 km, around Eccleshill in Bradford. Building, planning, schools, transport, prices and crime.
267new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+5.7%like-for-like prices in Eccleshill, 2024 → 2025 (council +5.1%)
-8%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
27 new homes completedhouses · Oct 2024 – Oct 2026
Oct 2026
2.0 km away - New homes
16 new homes completedhouses · Apr 2025 – Sep 2026
Sept 2026
1.9 km away - New homes
10 new homes completedhouses · Apr 2026 – Jun 2026
Jun 2026
1.2 km away - New homes
26 new homes completed18 flats, 8 houses · Feb 2026
Feb 2026
1.7 km away - New homes
22 new homes completedhouses · Sep 2025 – Feb 2026
Feb 2026
1.3 km away - New homes
12 new homes completedhouses · Feb 2025 – Nov 2025
Nov 2025
1.6 km away - New homes
13 new homes completedhouses · Apr 2025 – Oct 2025
Oct 2025
1.3 km away - New homes
51 new homes completedflats · Jul 2025
Jul 2025
750 m away - New homes
6 new homes completedhouses · Oct 2024 – Jul 2025
Jul 2025
1.8 km away - New homes
17 new homes completedhouses · Oct 2024 – Jun 2025
Jun 2025
1.3 km away - New homes
14 new homes completedhouses · Nov 2024 – Apr 2025
Apr 2025
1.4 km away - New homes
16 new homes completedhouses · Jan 2025 – Mar 2025
Mar 2025
1.5 km away
11homes extended 2021–2025, typically adding 27 m²
30since energy certificates began (2008)
1in BD10 8BW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
11storm overflows within 2 km
917hours of spills in 2025 between them (typical neighbourhood: about 36)
299spill events counted
- Yorkshire Water
Harrogate Road 297 Csointo The River Aire72 spills, 366 hours in 2025
1.6 km away - Yorkshire Water
Apperley Road Public Sewerinto River Aire66 spills, 168 hours in 2025
1.7 km away - Yorkshire Water
Roundwood Glen No 2 Csointo Carr Beck54 spills, 161 hours in 2025
1.0 km away - Yorkshire Water
Stock Hill Fold No 2 Csointo Haigh Beck46 spills, 142 hours in 2025
1.0 km away - Yorkshire Water
Ravenscliffe Avenue Csointo Fagley Beck12 spills, 37 hours in 2025
1.5 km away - Yorkshire Water
Beck Bottom Csointo Carr Beck16 spills, 27 hours in 2025
1.0 km away - Yorkshire Water
Woodhall Road No 2 Csointo Fagley Beck18 spills, 9 hours in 2025
2.0 km away - Yorkshire Water
Harrogate Road 298 Csointo Carr Beck12 spills, 6 hours in 2025
1.5 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
51 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Sainsburys - Solar PanelsApproved, not yet built · 310 kW
Sept 2024
750 m away - Other
Bradford Low Carbon HydrogenApproved, not yet built
Apr 2024
1.1 km away - Rooftop solar
Marston House, Otley Road - Solar PanelsApproved, not yet built · 3 MW
May 2023
3.0 km away - Rooftop solar
Sapper Jordan Rossi Park, Baildon - Solar PanelsApproved, not yet built · 300 kW
Oct 2022
3.1 km away - Battery storage
Midland Road - Battery Energy StorageApproved, not yet built · 80 MW
Dec 2024
3.5 km away - Rooftop solar
The University Of Bradford Stadium - Solar PanelsApproved, not yet built · 200 kW
Feb 2024
3.5 km away - Rooftop solar
Baildon CE Primary School, Coverdale Way - Solar Photovoltaic PanelsApproved, not yet built · 170 kW
Dec 2023
3.8 km away - Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityPlanning application in
May 2024
3.9 km away - Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityApproved, not yet built
Nov 2024
3.9 km away - Biomass
Unit 1, Whitehead Business Park - Biomass BoilerApproved, not yet built · 200 kW
Jan 2024
4.0 km away
Road and street works within 1 km
2 permitted works running now or planned.
- Standard
Rookwith Parade, BradfordDisconnection or alteration of supply · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026
600 m away - Minor
Rillington Mead, BradfordUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026
450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
22.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 700 m); Esholt WWTW (other, 2.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.