Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
2,195hours of spills in 2025 between them (typical neighbourhood: about 36)
222spill events counted
United Utilities
Waddington Wwtwinto Bashall Brook · near bathing water: River Ribble at Edisford Bridge145 spills, 1,935 hours in 2025
2.0 km away
United Utilities
West Bradford Psinto West Bradford Brook · near bathing water: River Ribble at Edisford Bridge28 spills, 170 hours in 2025
1.8 km away
United Utilities
Spring Gardens Waddington Csointo Waddington Brook · near bathing water: River Ribble at Edisford Bridge48 spills, 90 hours in 2025
1.6 km away
United Utilities
Adj Police Station King Street Csointo Trib Of Pendleton Brook By Sws1 spills, 0 hours in 2025
Bawdlands, ClitheroeDisconnection or alteration of supply · United Utilities Water Ltd · Multi-way signals
Oct 2026 to Oct 2026 850 m away
Minor
New Market Street, ClitheroeUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026 500 m away
Minor
Lowergate, ClitheroeNew service connection · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
East Irish Sea Transmission ProjectElectric Lines · The area of Irish Sea in English waters and a land fall area reaching from Crosby at the southern end, to Fleetwood at the northern end and Penwortham at the Eastern extent
application due March 2029 23.0 km away
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 23.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Clitheroe North: +27% over five years (2020 → 2025).
Council tax list: 210 homes added in the neighbourhood since April 2024.
Population (GP registrations): +3.9% in two years.