Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
454hours of spills in 2025 between them (typical neighbourhood: about 36)
218spill events counted
United Utilities
Tbcinto Hyndburn Brook89 spills, 229 hours in 2025
1.6 km away
United Utilities
Rishton Tank Csointo Liverpool & Leeds Canal54 spills, 99 hours in 2025
1.7 km away
United Utilities
Clayton Le Moors Tank Cso 22016into Hyndburn Brook38 spills, 74 hours in 2025
1.4 km away
United Utilities
Great Harwood (Hynburn Rd)Cso 22017into Hyndburn Brook37 spills, 52 hours in 2025
1.8 km away
United Utilities
Tbcinto Hyndburn Brook Via Surface Water Sewer0 spills, 0 hours in 2025
28 planned, approved or being built and 7 running (40 MW between them). Those within 5 km are on the map above.
Rooftop solar
St Christophers School, Queens Road - Solar PanelsApproved, not yet built · 410 kW
Jun 2023 3.4 km away
Rooftop solar
Church Works, Bridge Street - Solar PanelsApproved, not yet built
Jan 2026 3.7 km away
Rooftop solar
Ribble Business Park, Challenge Way - Solar PanelsApproved, not yet built · 520 kW
May 2025 3.7 km away
Rooftop solar
Whitebirk Depot Solar PanelsApproved, not yet built
Jan 2021 3.8 km away
Solar farm
Coach Road Meadow - Solar FarmApproved, not yet built · 2 MW
Jun 2024 3.9 km away
Battery storage
Davies Road - Whitebirk Battery StorageApproved, not yet built · 25 MW
Mar 2022 3.9 km away
Battery storage
Knuzden Moss Farm, Oswaldtwistle - Battery Energy Storage SystemApproved, not yet built · 60 MW
Oct 2025 4.1 km away
Rooftop solar
Whinney Hill Road - Solar Photovoltaic PanelsApproved, not yet built · 180 kW
Dec 2021 4.1 km away
Rooftop solar
Senator International, Newhouse Road - Solar Photovoltaics PanelsApproved, not yet built · 300 kW
Jul 2024 4.2 km away
Rooftop solar
Rhyddings Business And Enterprise School, Oswaldtwistle - Solar panelsApproved, not yet built · 220 kW
Oct 2024 4.5 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 23.6 km away
Pre-application
East Irish Sea Transmission ProjectElectric Lines · The area of Irish Sea in English waters and a land fall area reaching from Crosby at the southern end, to Fleetwood at the northern end and Penwortham at the Eastern extent
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Great Harwood: +31% over five years (2020 → 2025).
Council tax list: 120 homes added in the neighbourhood since April 2024.
Population (GP registrations): +2.1% in two years.
Gladstone Street, Little Harwood - Battery Energy Storage FacilityApproved, not yet built
May 2024 4.6 km away
Rooftop solar
Newhouse Road - Solar PV SystemPlanning application in · 430 kW
Feb 2021 4.6 km away
Running nearest: Whinney Hill Waste Disposal Site (landfill gas, 3.1 km); Whinney Hill II Energy (landfill gas, 3.4 km); ENWL Training Academy (solar farm, 4.1 km); Altham Business Park - Solar Panels (rooftop solar, 4.6 km); Hameldon Hill extension (wind farm, 7.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.