Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
510hours of spills in 2025 between them (typical neighbourhood: about 36)
274spill events counted
United Utilities
Tbcinto Hyndburn Brook89 spills, 229 hours in 2025
1.0 km away
United Utilities
Rishton Tank Csointo Liverpool & Leeds Canal54 spills, 99 hours in 2025
1.9 km away
United Utilities
Clayton Le Moors Tank Cso 22016into Hyndburn Brook38 spills, 74 hours in 2025
1.2 km away
United Utilities
Great Harwood (Hynburn Rd)Cso 22017into Hyndburn Brook37 spills, 52 hours in 2025
1.4 km away
United Utilities
Nearer Holker House Farm Ps (22012)into Clough Brook17 spills, 45 hours in 2025
30 planned, approved or being built and 8 running (42 MW between them). Those within 5 km are on the map above.
Rooftop solar
Whinney Hill Road - Solar Photovoltaic PanelsApproved, not yet built · 180 kW
Dec 2021 1.6 km away
Rooftop solar
St Christophers School, Queens Road - Solar PanelsApproved, not yet built · 410 kW
Jun 2023 1.7 km away
Rooftop solar
Senator International, Newhouse Road - Solar Photovoltaics PanelsApproved, not yet built · 300 kW
Jul 2024 1.7 km away
Rooftop solar
Newhouse Road - Solar PV SystemPlanning application in · 430 kW
Feb 2021 2.7 km away
Rooftop solar
Altham - Solar PVApproved, not yet built · 150 kW
Jan 2022 2.7 km away
Rooftop solar
Church Works, Bridge Street - Solar PanelsApproved, not yet built
Jan 2026 2.9 km away
Rooftop solar
Time Technology Park, Blackburn Road - Solar PanelsApproved, not yet built · 970 kW
Apr 2024 3.2 km away
Rooftop solar
Accrington and Rossendale College, Sandy Lane - Solar PV PanelsApproved, not yet built · 430 kW
Feb 2024 3.2 km away
Battery storage
Accrington and Rossendale College, Sandy Lane - Battery StorageApproved, not yet built · 1 MW
Feb 2024 3.2 km away
Solar farm
Coach Road Meadow - Solar FarmApproved, not yet built · 2 MW
Jun 2024 3.3 km away
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
Major, planned
Read Street, Clayton-Le-MoorsHighway improvement works · LANCASHIRE COUNTY COUNCIL · Give and take
Nov 2026 to Dec 2026 800 m away
Standard
Whalley Road, Clayton-Le-MoorsNew service connection · SP Electricity North West · Two-way signals
Jan 2027 to Jan 2027 550 m away
Standard
Victoria Street, Clayton-Le-MoorsUtility asset works · EE Ltd · Two-way signals
Nov 2026 to Nov 2026 700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
East Irish Sea Transmission ProjectElectric Lines · The area of Irish Sea in English waters and a land fall area reaching from Crosby at the southern end, to Fleetwood at the northern end and Penwortham at the Eastern extent
application due March 2029 26.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Clayton-le-Moors & Huncoat: +25% over five years (2020 → 2025).
Council tax list: 100 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.8% in two years.
Mount Carmel RC High School, Wordsworth Road - Solar PanelsApproved, not yet built · 180 kW
Dec 2025 3.5 km away
Rooftop solar
Rhyddings Business And Enterprise School, Oswaldtwistle - Solar panelsApproved, not yet built · 220 kW
Oct 2024 3.6 km away
Running nearest: Whinney Hill Waste Disposal Site (landfill gas, 900 m); Whinney Hill II Energy (landfill gas, 900 m); Altham Business Park - Solar Panels (rooftop solar, 2.7 km); Hameldon Hill extension (wind farm, 4.6 km); New Barn Farm (wind farm, 4.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.