Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
666hours of spills in 2025 between them (typical neighbourhood: about 36)
242spill events counted
United Utilities
Accrington Ssointo River Hyndburn74 spills, 353 hours in 2025
800 m away
United Utilities
Oswaldtwistle Csointo White Ash Brook54 spills, 177 hours in 2025
1.6 km away
United Utilities
Rishton Tank Csointo Liverpool & Leeds Canal54 spills, 99 hours in 2025
31 planned, approved or being built and 7 running (40 MW between them). Those within 5 km are on the map above.
Rooftop solar
St Christophers School, Queens Road - Solar PanelsApproved, not yet built · 410 kW
Jun 2023 200 m away
Rooftop solar
Church Works, Bridge Street - Solar PanelsApproved, not yet built
Jan 2026 1.2 km away
Solar farm
Coach Road Meadow - Solar FarmApproved, not yet built · 2 MW
Jun 2024 1.6 km away
Rooftop solar
Whinney Hill Road - Solar Photovoltaic PanelsApproved, not yet built · 180 kW
Dec 2021 1.7 km away
Rooftop solar
Mount Carmel RC High School, Wordsworth Road - Solar PanelsApproved, not yet built · 180 kW
Dec 2025 1.8 km away
Rooftop solar
Senator International, Newhouse Road - Solar Photovoltaics PanelsApproved, not yet built · 300 kW
Jul 2024 1.8 km away
Rooftop solar
Rhyddings Business And Enterprise School, Oswaldtwistle - Solar panelsApproved, not yet built · 220 kW
Oct 2024 1.9 km away
Rooftop solar
Accrington and Rossendale College, Sandy Lane - Solar PV PanelsApproved, not yet built · 430 kW
Feb 2024 2.0 km away
Battery storage
Accrington and Rossendale College, Sandy Lane - Battery StorageApproved, not yet built · 1 MW
Feb 2024 2.0 km away
Rooftop solar
The Hollins, Hollins Lane - Solar PanelsApproved, not yet built · 330 kW
Apr 20243.0 km away
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
Major
Countess Street, AccringtonHighway improvement works · LANCASHIRE COUNTY COUNCIL · Two-way signals
Sept 2026 to Oct 2026 650 m away
Major
Russia Street, AccringtonHighway improvement works · LANCASHIRE COUNTY COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026 700 m away
Minor
Queens Road West, ChurchUtility repair and maintenance works · United Utilities Water Ltd · No carriageway incursion
Oct 2026 to Oct 2026 150 m away
Minor
Lonsdale Street, AccringtonRemedial works · United Utilities Water Ltd · Multi-way signals
Oct 2026 to Oct 2026 900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
East Irish Sea Transmission ProjectElectric Lines · The area of Irish Sea in English waters and a land fall area reaching from Crosby at the southern end, to Fleetwood at the northern end and Penwortham at the Eastern extent
application due March 2029 27.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Church: +36% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.6% in two years.
Knuzden Moss Farm, Oswaldtwistle - Battery Energy Storage SystemApproved, not yet built · 60 MW
Oct 2025 3.2 km away
Solar farm
Ramsclough Farm, Haslingden Old Road - Solar FarmPlanning application in · 26 MW
Jan 2026 4.2 km away
Running nearest: Whinney Hill Waste Disposal Site (landfill gas, 1.1 km); Whinney Hill II Energy (landfill gas, 1.5 km); Altham Business Park - Solar Panels (rooftop solar, 4.2 km); ENWL Training Academy (solar farm, 4.8 km); Hameldon Hill extension (wind farm, 5.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.