Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
184hours of spills in 2025 between them (typical neighbourhood: about 36)
55spill events counted
United Utilities
Carr Mill Street Csointo Clvrt'D Section Swinnel Brook43 spills, 180 hours in 2025
1.4 km away
United Utilities
Scott Avenue/Hurstead Street Csointo Woodnook Water11 spills, 3 hours in 2025
1.0 km away
United Utilities
Hill Street Csointo Woodnook Water1 spills, 1 hours in 2025
1.7 km away
United Utilities
560 Manchester Road Csointo Via Culvert To Woodnook Water0 spills, 0 hours in 2025
600 m away
United Utilities
Rear Of 489 Manchester Road Csointo Woodnook Water Via Sws0 spills, 0 hours in 2025
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 20.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Haslingden: +38% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.3% in two years.