Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
433hours of spills in 2025 between them (typical neighbourhood: about 36)
147spill events counted
United Utilities
Accrington Ssointo River Hyndburn74 spills, 353 hours in 2025
1.9 km away
United Utilities
Nearer Holker House Farm Ps (22012)into Clough Brook17 spills, 45 hours in 2025
1.9 km away
United Utilities
Priestley Clough Csointo Woodnook Water15 spills, 17 hours in 2025
32 planned, approved or being built and 12 running (48 MW between them). Those within 5 km are on the map above.
Rooftop solar
Accrington and Rossendale College, Sandy Lane - Solar PV PanelsApproved, not yet built · 430 kW
Feb 2024 950 m away
Battery storage
Accrington and Rossendale College, Sandy Lane - Battery StorageApproved, not yet built · 1 MW
Feb 2024 950 m away
Rooftop solar
St Christophers School, Queens Road - Solar PanelsApproved, not yet built · 410 kW
Jun 2023 1.0 km away
Rooftop solar
Whinney Hill Road - Solar Photovoltaic PanelsApproved, not yet built · 180 kW
Dec 2021 1.1 km away
Rooftop solar
Senator International, Newhouse Road - Solar Photovoltaics PanelsApproved, not yet built · 300 kW
Jul 2024 1.3 km away
Rooftop solar
Mount Carmel RC High School, Wordsworth Road - Solar PanelsApproved, not yet built · 180 kW
Dec 2025 1.7 km away
Rooftop solar
Church Works, Bridge Street - Solar PanelsApproved, not yet built
Jan 2026 2.0 km away
Rooftop solar
The Hollins, Hollins Lane - Solar PanelsApproved, not yet built · 330 kW
Apr 2024 2.2 km away
Rooftop solar
Rhyddings Business And Enterprise School, Oswaldtwistle - Solar panelsApproved, not yet built · 220 kW
Oct 2024 2.2 km away
Solar farm
Coach Road Meadow - Solar FarmApproved, not yet built · 2 MW
Jun 20242.4 km away
Road and street works within 1 km
7 permitted works running now or planned, 5 of them major.
Major, planned
Whalley Road, AccringtonDiversionary works · SP Electricity North West · Road closure
Nov 2026 to Dec 2026 150 m away
Major
Whalley Road, AccringtonDiversionary works · SP Electricity North West · Road closure
Oct 2026 to Nov 2026 150 m away
Major
Marlborough Road, AccringtonDiversionary works · SP Electricity North West · Road closure
Oct 2026 to Oct 2026 200 m away
Major, planned
Cambridge Street, AccringtonDisconnection or alteration of supply · United Utilities Water Ltd · Road closure
Nov 2026 to Nov 2026 300 m away
Major
Clifton Avenue, AccringtonDiversionary works · SP Electricity North West · Road closure
Oct 2026 to Oct 2026 350 m away
Minor
Blackburn Road, AccringtonRemedial works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026 450 m away
Minor
Queens Road West, ChurchUtility repair and maintenance works · United Utilities Water Ltd · No carriageway incursion
Oct 2026 to Oct 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
East Irish Sea Transmission ProjectElectric Lines · The area of Irish Sea in English waters and a land fall area reaching from Crosby at the southern end, to Fleetwood at the northern end and Penwortham at the Eastern extent
application due March 2029 28.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Accrington North East: +37% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.7% in two years.
Ramsclough Farm, Haslingden Old Road - Solar FarmPlanning application in · 26 MW
Jan 2026 3.8 km away
Solar farm
Paragon Works, Rising Bridge Road - Solar FarmApproved, not yet built · 1 MW
Apr 2025 3.8 km away
Running nearest: Whinney Hill Waste Disposal Site (landfill gas, 1.4 km); Whinney Hill II Energy (landfill gas, 1.5 km); Altham Business Park - Solar Panels (rooftop solar, 4.0 km); Hameldon Hill extension (wind farm, 4.1 km); New Barn Farm (wind farm, 4.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.