Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
3hours of spills in 2025 between them (typical neighbourhood: about 36)
3spill events counted
United Utilities
Burnley Rd E /Whitewell Bottom Csointo Whitewell Brook3 spills, 3 hours in 2025
22 planned, approved or being built and 18 running (164 MW between them). Those within 5 km are on the map above.
Battery storage
Park Road Battery StorageApproved, not yet built · 10 MW
Nov 2021 4.3 km away
Battery storage
Former Bull & Butcher Pub - Battery Energy StorageApproved, not yet built
Jul 2023 5.0 km away
Solar farm
Paragon Works, Rising Bridge Road - Solar FarmApproved, not yet built · 1 MW
Apr 2025 6.2 km away
Solar farm
Coal Clough Wind Farm (Co-located)Planning application in · 10 MW
Sept 2019 6.5 km away
Energy from waste
Hapton Valley Transfer Station, Accrington Road - Combined Heat And PowerApproved, not yet built
Nov 2023 6.6 km away
Rooftop solar
The Hollins, Hollins Lane - Solar PanelsApproved, not yet built · 330 kW
Apr 2024 7.4 km away
Rooftop solar
Accrington and Rossendale College, Sandy Lane - Solar PV PanelsApproved, not yet built · 430 kW
Feb 2024 7.9 km away
Battery storage
Accrington and Rossendale College, Sandy Lane - Battery StorageApproved, not yet built · 1 MW
Feb 2024 7.9 km away
Battery storage
he Yard, Holme Road, Burnley - Battery StoreagePlanning application in
Dec 2022 8.4 km away
Solar farm
Crow Wood, Holme Road - Solar ArrayApproved, not yet built
Dec 2023 8.4 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Crawshawbooth, Reedsholme & Water: +39% over five years (2020 → 2025).
Council tax list: 50 homes added in the neighbourhood since April 2024.
Population (GP registrations): +1.1% in two years.