Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
12storm overflows within 2 km
2,188hours of spills in 2025 between them (typical neighbourhood: about 36)
311spill events counted
United Utilities
The Glen Combined Sewer Overflowinto River Irwell139 spills, 1,306 hours in 2025
1.1 km away
United Utilities
295 Bacup Road Csointo River Irwell73 spills, 458 hours in 2025
1.4 km away
United Utilities
Newchurch Road Cso (36013)into River Irwell27 spills, 226 hours in 2025
1.4 km away
United Utilities
143 Burnley Road East Csointo Whitewell Brook28 spills, 107 hours in 2025
400 m away
United Utilities
Highfield Road Csointo River Irwell13 spills, 37 hours in 2025
850 m away
United Utilities
Waterbarn Lane Csointo River Irwell7 spills, 22 hours in 2025
1.4 km away
United Utilities
Burnley Rd E/Booth St Csointo Whitewell Brook13 spills, 15 hours in 2025
550 m away
United Utilities
Cowde Rd Br.into River Irwell4 spills, 7 hours in 2025
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 17.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Waterfoot & Stacksteads: +43% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.1% in two years.