What's changing near BB4 4BU
Within 2 km, around Haslingden in Rossendale. Building, planning, schools, transport, prices and crime.
11new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+5.1%like-for-like prices in Haslingden, 2024 → 2025 (council +5.5%)
-7%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
10 new homes completedflats · Mar 2026
Mar 2026
1.5 km away - School closed
School closed: Austen HouseOther independent school, other independent school (closure)
Jul 2025
1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 2 postcodes nearby had new homes completed in the last two years.
11homes extended 2021–2025, typically adding 26 m²
21since energy certificates began (2008)
1in BB4 4BU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
464hours of spills in 2025 between them (typical neighbourhood: about 36)
201spill events counted
- United Utilities
Carr Mill Street Csointo Clvrt'D Section Swinnel Brook43 spills, 180 hours in 2025
1.9 km away - United Utilities
New Hall Hey Road Csointo River Irwell30 spills, 111 hours in 2025
1.5 km away - United Utilities
Helmshore Caravan Park Csointo Swinnel Brook48 spills, 106 hours in 2025
950 m away - United Utilities
Manchester Rd Dalesford Rd 362ejinto Rvr Irwell Via Langwood Brook58 spills, 53 hours in 2025
250 m away - United Utilities
Langwood Brook Csointo Clvrt'D Section Langwood Brook6 spills, 10 hours in 2025
400 m away - United Utilities
Manchester Road Sewerinto Swinnel Brook13 spills, 4 hours in 2025
950 m away - United Utilities
Manchester Rd Cso (363f2)into Culverted Langwood Brook2 spills, 0 hours in 2025
850 m away - United Utilities
Deardengate/Bury Road Csointo Swinnel Brook1 spills, 0 hours in 2025
950 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
20 planned, approved or being built and 10 running (110 MW between them). Those within 5 km are on the map above.
- Solar farm
Paragon Works, Rising Bridge Road - Solar FarmApproved, not yet built · 1 MW
Apr 2025
3.2 km away - Solar farm
Ramsclough Farm, Haslingden Old Road - Solar FarmPlanning application in · 26 MW
Jan 2026
4.1 km away - Wind farm
Hyndburn Wind Farm ExtensionApproved, not yet built · 8 MW
Jun 2015
4.5 km away - Rooftop solar
The Hollins, Hollins Lane - Solar PanelsApproved, not yet built · 330 kW
Apr 2024
4.8 km away - Rooftop solar
Accrington and Rossendale College, Sandy Lane - Solar PV PanelsApproved, not yet built · 430 kW
Feb 2024
6.0 km away - Battery storage
Accrington and Rossendale College, Sandy Lane - Battery StorageApproved, not yet built · 1 MW
Feb 2024
6.0 km away - Rooftop solar
Mount Carmel RC High School, Wordsworth Road - Solar PanelsApproved, not yet built · 180 kW
Dec 2025
6.1 km away - Rooftop solar
Rhyddings Business And Enterprise School, Oswaldtwistle - Solar panelsApproved, not yet built · 220 kW
Oct 2024
6.7 km away - Solar farm
Coach Road Meadow - Solar FarmApproved, not yet built · 2 MW
Jun 2024
7.4 km away - Rooftop solar
Church Works, Bridge Street - Solar PanelsApproved, not yet built
Jan 2026
7.5 km away
Road and street works within 1 km
3 permitted works running now or planned.
- Standard
Manchester Road, HaslingdenNew service connection · SP Electricity North West · Multi-way signals
Jan 2027 to Jan 2027
400 m away - Standard
Haslingden Road, RawtenstallNew service connection · SP Electricity North West · Two-way signals
Oct 2026 to Oct 2026
850 m away - Minor
Deardengate, HaslingdenPermanent reinstatement · SP Electricity North West · Some carriageway incursion
Oct 2026 to Oct 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Sept 2025
17.1 km away - Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
21.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Rossendale Power (landfill gas, 2.5 km); Horncliffe Quarry (Extension) (landfill gas, 2.5 km); Horncliffe Quarry (landfill gas, 2.5 km); Hyndburn Wind Farm (wind farm, 4.6 km); Scout Moor Windfarm (wind farm, 5.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.