Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
160hours of spills in 2025 between them (typical neighbourhood: about 36)
52spill events counted
United Utilities
Altham Outfall Csointo River Calder49 spills, 157 hours in 2025
1.5 km away
United Utilities
In Front Of No.19 Bear Street Csointo Sweet Clough Trib Green Brook3 spills, 3 hours in 2025
1.9 km away
United Utilities
Levant Mill Footbridge Cso (O82cv)into Green Brook0 spills, 0 hours in 2025
1.9 km away
United Utilities
Stockbridge Road Cso (Bur0038)into Green Brook0 spills, 0 hours in 2025
34 planned, approved or being built and 11 running (48 MW between them). Those within 5 km are on the map above.
Energy from waste
Hapton Valley Transfer Station, Accrington Road - Combined Heat And PowerApproved, not yet built
Nov 2023 1.7 km away
Rooftop solar
Newhouse Road - Solar PV SystemPlanning application in · 430 kW
Feb 2021 2.0 km away
Rooftop solar
Altham - Solar PVApproved, not yet built · 150 kW
Jan 2022 2.0 km away
Rooftop solar
Time Technology Park, Blackburn Road - Solar PanelsApproved, not yet built · 970 kW
Apr 2024 2.4 km away
Rooftop solar
Senator International, Newhouse Road - Solar Photovoltaics PanelsApproved, not yet built · 300 kW
Jul 2024 2.8 km away
Rooftop solar
Whinney Hill Road - Solar Photovoltaic PanelsApproved, not yet built · 180 kW
Dec 2021 3.0 km away
Battery storage
Former Bull & Butcher Pub - Battery Energy StorageApproved, not yet built
Jul 2023 4.0 km away
Rooftop solar
Accrington and Rossendale College, Sandy Lane - Solar PV PanelsApproved, not yet built · 430 kW
Feb 2024 4.2 km away
Battery storage
Accrington and Rossendale College, Sandy Lane - Battery StorageApproved, not yet built · 1 MW
Feb 2024 4.2 km away
Rooftop solar
St Christophers School, Queens Road - Solar PanelsApproved, not yet built · 410 kW
Jun 20234.5 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Hapton & Lowerhouse: +30% over five years (2020 → 2025).
Council tax list: 100 homes added in the neighbourhood since April 2024.
Population (GP registrations): +2.5% in two years.
he Yard, Holme Road, Burnley - Battery StoreagePlanning application in
Dec 2022 4.8 km away
Solar farm
Crow Wood, Holme Road - Solar ArrayApproved, not yet built
Dec 2023 4.8 km away
Running nearest: New Barn Farm (wind farm, 1.2 km); Hameldon Hill extension (wind farm, 1.3 km); Altham Business Park - Solar Panels (rooftop solar, 2.0 km); Whinney Hill II Energy (landfill gas, 3.4 km); Whinney Hill Waste Disposal Site (landfill gas, 3.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.