75new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.6%like-for-like prices in Cliviger, Worsthorne & Lane Bottom, 2024 → 2025 (council +5.3%)
-3%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedhouses · Aug 2026
Aug 2026
350 m away - New homes
13 new homes completedhouses · Nov 2025 – Mar 2026
Mar 2026
400 m away - New homes
5 new homes completedhouses · Aug 2025 – Feb 2026
Feb 2026
350 m away - New homes
25 new homes completedhouses · Nov 2024 – Aug 2025
Aug 2025
750 m away - New homes
5 new homes completedhouses · Jun 2025 – Aug 2025
Aug 2025
350 m away - New homes
5 new homes completedhouses · May 2025
May 2025
100 m away - New homes
10 new homes completedhouses · Nov 2024 – Jan 2025
Jan 2025
1.2 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
6homes extended 2021–2025, typically adding 23 m²
6since energy certificates began (2008)
0in BB10 3LR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
17 planned, approved or being built and 9 running (46 MW between them). Those within 5 km are on the map above.
- Battery storage
Widow Hill, Balderstone Lane - Battery Energy Storage SystemBeing built · 70 MW
May 2025
2.2 km away - Solar farm
Safran Nacelles, Bancroft Road - Solar PanelsApproved, not yet built · 1 MW
Apr 2024
2.3 km away - Rooftop solar
Burnley General Hospital, Casterton Avenue - Solar PanelsApproved, not yet built · 970 kW
Jan 2026
3.3 km away - Battery storage
he Yard, Holme Road, Burnley - Battery StoreagePlanning application in
Dec 2022
4.3 km away - Solar farm
Crow Wood, Holme Road - Solar ArrayApproved, not yet built
Dec 2023
4.3 km away - Battery storage
Former Bull & Butcher Pub - Battery Energy StorageApproved, not yet built
Jul 2023
4.9 km away - Solar farm
Coal Clough Wind Farm (Co-located)Planning application in · 10 MW
Sept 2019
5.0 km away - Battery storage
The Old Vicarage, Reedley - Battery StorageApproved, not yet built · 100 MW
Jun 2025
5.1 km away - Wind farm
Doughty Farm, Back Lane - Wind TurbineApproved, not yet built · 230 kW
Feb 2025
5.9 km away - Rooftop solar
Pendleside, Fence - Solar PanelsApproved, not yet built · 250 kW
Oct 2024
6.1 km away - Rooftop solar
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
9.2 km away - Decideddecided Sept 2025
27.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Rowley (landfill gas, 2.1 km); Queens Park Energy (landfill gas, 2.1 km); Queen's Park Road Energy (landfill gas, 2.5 km); Deerplay Landfill Site (landfill gas, 4.7 km); Coal Clough Wind Farm (wind farm, 5.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.