What's changing near BB10 3FD
Within 2 km, around Bank Hall & Fulledge in Burnley. Building, planning, schools, transport, prices and crime.
190new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-1.4%like-for-like prices in Bank Hall & Fulledge, 2024 → 2025 (council +5.3%)
-9%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
32 new homes completedflats · Mar 2026
Mar 2026
1.4 km away - New homes
29 new homes completedhouses · Oct 2024 – Aug 2025
Aug 2025
1.5 km away - New homes
7 new homes completedflats · Aug 2025
Aug 2025
1.1 km away - New homes
93 new homes completedflats · Apr 2025
Apr 2025
1.5 km away - New homes
8 new homes completedhouses · Nov 2024 – Apr 2025
Apr 2025
1.4 km away - New schoolSept 2023
750 m away - School closed
School closed: Aspire Hub BurnleyOther independent special school, other independent special school (closure)
Jul 2023
1.5 km away - New schoolMar 2021
1.8 km away - School closed
School closed: Thomas Whitham Sixth FormCommunity school, 16 plus (closure)
Aug 2020
1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 17 postcodes nearby had new homes completed in the last two years.
2homes extended 2021–2025, typically adding 23 m²
22since energy certificates began (2008)
1in BB10 3FD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
9hours of spills in 2025 between them (typical neighbourhood: about 36)
6spill events counted
- United Utilities
Brooklands Road/Todmorden Road Csointo Unnamed Trib Of River Calder6 spills, 9 hours in 2025
1.8 km away - United Utilities
Ne Area Sewerinto River Burn0 spills, 0 hours in 2025
550 m away - United Utilities
Waterbarn Street/Barden Lane Csointo Unnamed Trib Of River Calder0 spills, 0 hours in 2025
2.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
21 planned, approved or being built and 10 running (48 MW between them). Those within 5 km are on the map above.
- Solar farm
Safran Nacelles, Bancroft Road - Solar PanelsApproved, not yet built · 1 MW
Apr 2024
850 m away - Battery storage
Widow Hill, Balderstone Lane - Battery Energy Storage SystemBeing built · 70 MW
May 2025
1.4 km away - Rooftop solar
Burnley General Hospital, Casterton Avenue - Solar PanelsApproved, not yet built · 970 kW
Jan 2026
1.8 km away - Battery storage
he Yard, Holme Road, Burnley - Battery StoreagePlanning application in
Dec 2022
2.0 km away - Solar farm
Crow Wood, Holme Road - Solar ArrayApproved, not yet built
Dec 2023
2.0 km away - Battery storage
The Old Vicarage, Reedley - Battery StorageApproved, not yet built · 100 MW
Jun 2025
3.2 km away - Battery storage
Former Bull & Butcher Pub - Battery Energy StorageApproved, not yet built
Jul 2023
3.4 km away - Energy from waste
Hapton Valley Transfer Station, Accrington Road - Combined Heat And PowerApproved, not yet built
Nov 2023
4.7 km away - Rooftop solar
Pendleside, Fence - Solar PanelsApproved, not yet built · 250 kW
Oct 2024
4.9 km away - Rooftop solar
Nelson and colne college, Scotland RoadApproved, not yet built · 450 kW
Sept 2023
5.6 km away
Road and street works within 1 km
2 permitted works running now or planned.
- Minor
Olympia Street, BurnleyRemedial works · United Utilities Water Ltd · Multi-way signals
Oct 2026 to Oct 2026
900 m away - Minor
Todmorden Road, BurnleyHighway repair and maintenance works · LANCASHIRE COUNTY COUNCIL · Stop/go boards
Nov 2026 to Nov 2026
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
11.3 km away - Decideddecided Sept 2025
27.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Rowley (landfill gas, 300 m); Queen's Park Road Energy (landfill gas, 400 m); Queens Park Energy (landfill gas, 700 m); Deerplay Landfill Site (landfill gas, 4.8 km); New Barn Farm (wind farm, 5.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.