What's changing near BB10 3DA
Within 2 km, around Central Burnley & Daneshouse in Burnley. Building, planning, schools, transport, prices and crime.
270new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-2.7%like-for-like prices in Central Burnley & Daneshouse, 2024 → 2025 (council +5.3%)
-10%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
26 new homes completedhouses · Oct 2025 – Aug 2026
Aug 2026
1.6 km away - New homes
32 new homes completedflats · Mar 2026
Mar 2026
1.9 km away - New homes
43 new homes completed2 flats, 41 houses · Dec 2024 – Jan 2026
Jan 2026
1.2 km away - New homes
16 new homes completed2 flats, 14 houses · Oct 2025 – Jan 2026
Jan 2026
1.2 km away - New homes
10 new homes completedhouses · Sep 2025 – Jan 2026
Jan 2026
1.7 km away - New homes
14 new homes completedhouses · Feb 2025 – Jan 2026
Jan 2026
1.2 km away - New schoolNov 2025
1.7 km away - New homes
7 new homes completedflats · Aug 2025
Aug 2025
1.3 km away - New homes
93 new homes completedflats · Apr 2025
Apr 2025
600 m away - New homes
8 new homes completedhouses · Nov 2024 – Apr 2025
Apr 2025
700 m away - New schoolSept 2023
1.1 km away
18homes extended 2021–2025, typically adding 23 m²
174since energy certificates began (2008)
2in BB10 3DA itself
- Extendedcertificate 2016
- Extendedcertificate 2014
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
270hours of spills in 2025 between them (typical neighbourhood: about 36)
82spill events counted
- United Utilities
Crow Wood Cso 08070into Calder - Conf Brun To Pendle Water78 spills, 270 hours in 2025
1.7 km away - United Utilities
134 Burnley Road Csointo Pendle Water Via Culvert4 spills, 0 hours in 2025
2.0 km away - United Utilities
Ne Area Sewerinto River Burn0 spills, 0 hours in 2025
450 m away - United Utilities
Waterbarn Street/Barden Lane Csointo Unnamed Trib Of River Calder0 spills, 0 hours in 2025
1.3 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
19 planned, approved or being built and 10 running (48 MW between them). Those within 5 km are on the map above.
- Solar farm
Safran Nacelles, Bancroft Road - Solar PanelsApproved, not yet built · 1 MW
Apr 2024
700 m away - Rooftop solar
Burnley General Hospital, Casterton Avenue - Solar PanelsApproved, not yet built · 970 kW
Jan 2026
950 m away - Battery storage
Widow Hill, Balderstone Lane - Battery Energy Storage SystemBeing built · 70 MW
May 2025
1.1 km away - Battery storage
he Yard, Holme Road, Burnley - Battery StoreagePlanning application in
Dec 2022
1.5 km away - Solar farm
Crow Wood, Holme Road - Solar ArrayApproved, not yet built
Dec 2023
1.5 km away - Battery storage
The Old Vicarage, Reedley - Battery StorageApproved, not yet built · 100 MW
Jun 2025
2.3 km away - Rooftop solar
Pendleside, Fence - Solar PanelsApproved, not yet built · 250 kW
Oct 2024
3.9 km away - Battery storage
Former Bull & Butcher Pub - Battery Energy StorageApproved, not yet built
Jul 2023
4.0 km away - Rooftop solar
Nelson and colne college, Scotland RoadApproved, not yet built · 450 kW
Sept 2023
4.7 km away - Battery storage
Nelson and colne college, Scotland RoadApproved, not yet built · 1 MW
May 2024
4.7 km away - Energy from waste
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
- Major, planned
Brennand Street, BurnleyUtility repair and maintenance works · United Utilities Water Ltd · Road closure
Nov 2026 to Nov 2026
250 m away - Major
Thursby Road, BurnleyUtility repair and maintenance works · United Utilities Water Ltd · Road closure
Nov 2026 to Nov 2026
300 m away - Minor
Briercliffe Road, BurnleyUtility repair and maintenance works · United Utilities Water Ltd · Two-way signals
Nov 2026 to Nov 2026
250 m away - Minor
Lindale Crescent, BurnleyDisconnection or alteration of supply · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026
1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
11.6 km away - Decideddecided Sept 2025
28.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Queen's Park Road Energy (landfill gas, 600 m); Queens Park Energy (landfill gas, 750 m); Rowley (landfill gas, 950 m); Deerplay Landfill Site (landfill gas, 5.7 km); New Barn Farm (wind farm, 5.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.