Country England and Wales › Region South West › Council Bath and North East Somerset › Neighbourhood Westfield › Postcode BA3 3SR What's changing near BA3 3SR Within 2 km, around Westfield in Bath and North East Somerset. Building, planning, schools, transport, prices and crime.
145 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.4% like-for-like prices in Westfield, 2024 → 2025 (council +2.4%)
-8% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 35 new homes completed houses · Nov 2025 – Oct 2026
planned Oct 2026 2.0 km away New homes 19 new homes completed houses · Jul 2025 – Oct 2026
planned Oct 2026 1.9 km away New homes 26 new homes completed houses · Nov 2025 – May 2026
May 2026 1.9 km away New school New school: The Universal Farm Other independent special school, other independent special school
Apr 2026 1.2 km away New homes 11 new homes completed houses · Aug 2025 – Mar 2026
Mar 2026 1.8 km away New homes 9 new homes completed flats · Mar 2026
Mar 2026 2.0 km away New homes 8 new homes completed houses · Jul 2025
Jul 2025 1.6 km away New homes 7 new homes completed houses · Jul 2025
Jul 2025 1.6 km away New homes 5 new homes completed flats · Jun 2025
Jun 2025 1.3 km away New homes 7 new homes completed houses · Feb 2025
Feb 2025 1.5 km away New school Sept 2020 1.7 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 20 postcodes nearby had new homes completed in the last two years.
16 homes extended 2021–2025, typically adding 22 m²
24 since energy certificates began (2008)
4 in BA3 3SR itself
Extended certificate 2024 Extended certificate 2024 Extended certificate 2022 Extended certificate 2013 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 11 storm overflows within 2 km
207 hours of spills in 2025 between them (typical neighbourhood: about 36)
151 spill events counted
Wessex Water Welton Hollow Cso into Wellow Brook 28 spills, 92 hours in 2025
650 m away Wessex Water Berkeley Avenue Cso into Wellow Brook 28 spills, 58 hours in 2025
1.5 km away Wessex Water Somervale Road Combined Sewer Of into Wellow Brook 40 spills, 25 hours in 2025
750 m away Wessex Water Pine Court Combined Sewer Overflow into Wellow Brook 10 spills, 16 hours in 2025
1.9 km away Wessex Water Kilmersdon Road Cso into Waterside 28 spills, 13 hours in 2025
1.2 km away Wessex Water Waterside Combined Sewer Overflow into Trib Of Waterside 9 spills, 2 hours in 2025
500 m away Wessex Water Welton Storm Relief Overflow into Trib Of Midford Brook (S) 7 spills, 1 hours in 2025
1.4 km away Wessex Water Frome Road Combined Sewer Overflow into Wellow Brook 1 spills, 0 hours in 2025
1.6 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 14 planned, approved or being built and 7 running (30 MW between them). Those within 5 km are on the map above.
Battery storage Midsomer Norton - Battery Energy Storage System Being built · 6 MW
Dec 2022 800 m away Rooftop solar Bridges Electrical Engineers, Second Avenue - Solar Panels Approved, not yet built · 320 kW
Feb 2024 1.0 km away Rooftop solar Optima Products, Mill Road - Solar Panels Approved, not yet built · 300 kW
May 2023 2.1 km away Solar farm Parcel 2882, Water Lane - Solar Farm Approved, not yet built · 9 MW
Jun 2025 2.2 km away Battery storage Parcel 2882, Water Lane - Battery Storage Approved, not yet built
Jun 2025 2.2 km away Rooftop solar Paulton House, Old Mills - Solar Panels Approved, not yet built · 190 kW
Feb 2025 2.8 km away Solar farm Ash Farm, Charlton Road - Solar Panels Approved, not yet built · 5 MW
Dec 2024 3.1 km away Battery storage Ash Farm, Charlton Road - Battery Storage System Approved, not yet built · 10 MW
Dec 2024 3.1 km away Solar farm Bays Lane, Gurney Slade - Solar Panels Planning application in · 2 MW
Sept 2025 7.0 km away Solar farm Marksbury Plain - Solar Park Approved, not yet built · 15 MW
Jul 2022 7.5 km away Solar farm Road and street works within 1 km 4 permitted works running now or planned, 1 of them major.
Major, planned Radstock Road, Midsomer Norton Utility asset works · BT · Road closure
Jan 2027 to Jan 2027 950 m away Standard Wheelers Road, Midsomer Norton Utility repair and maintenance works · National Grid Electricity Distribution (South West) · Some carriageway incursion
Oct 2026 to Oct 2026 500 m away Minor Wells Road, Westfield Utility repair and maintenance works · WESSEX WATER · Multi-way signals
Oct 2026 to Oct 2026 500 m away Minor Fosseway, Westfield Utility repair and maintenance works · WESSEX WATER · Two-way signals
Oct 2026 to Oct 2026 800 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jan 2016 22.3 km away Pre-application Hinkley Point C Connection Project Material Change Electric Lines · The Project proposes permanent access infrastructure for the purpose of maintenance access and operation at locations between Bridgwater and Seabank, in the administrative boundaries of Bristol City, North Somerset, Somerset and South Gloucestershire Councils. application due January 2028 26.8 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Langleys Lane - Electricity Generation Plant (landfill gas, 3.2 km); SOLAR PARK - WHITCHURCH FARM (solar farm, 4.4 km); Land at Soho Farm (solar farm, 6.4 km); Hunstrete (Wilmington Farm) (solar farm, 7.8 km); Chelwood Solar Farm (solar farm, 7.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.