Country England and Wales › Region South West › Council Bath and North East Somerset › Neighbourhood Odd Down › Postcode BA2 2UR What's changing near BA2 2UR Within 2 km, around Odd Down in Bath and North East Somerset. Building, planning, schools, transport, prices and crime.
96 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.2% like-for-like prices in Odd Down, 2024 → 2025 (council +2.4%)
-14% recorded crime, last 12 months vs the 12 before
On the map
New homes School closed Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 30 new homes completed flats · Feb 2025 – Oct 2026
planned Oct 2026 1.8 km away New homes 16 new homes completed flats · Jan 2026
Feb 2026 1.6 km away New homes 13 new homes completed houses · Jan 2025 – Oct 2025
Oct 2025 1.9 km away New homes 8 new homes completed houses · Dec 2024 – Mar 2025
Mar 2025 800 m away New homes 7 new homes completed 1 flats, 6 houses · Nov 2024 – Mar 2025
Mar 2025 800 m away New homes 9 new homes completed houses · Nov 2024
Nov 2024 800 m away School closed School closed: The Bath Studio School Studio schools, secondary (closure)
Aug 2020 600 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
13 homes extended 2021–2025, typically adding 20 m²
28 since energy certificates began (2008)
3 in BA2 2UR itself
Extended certificate 2021 Extended certificate 2019 Extended certificate 2019 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 11 planned, approved or being built and 3 running (12 MW between them). Those within 5 km are on the map above.
Anaerobic digestion Fosseway Environment Park Being built · 1 MW
Sept 2018 1.7 km away Rooftop solar Bath Sports And Leisure Centre, North Parade Road - Solar PV Panels Being built
Jan 2025 3.1 km away Rooftop solar Royal United Hospital, Combe Park - Solar Panels Approved, not yet built · 310 kW
Apr 2025 3.8 km away Rooftop solar King Edwards School, North Road - Solar Panels Being built · 220 kW
Jul 2023 4.0 km away Solar farm Marksbury Plain - Solar Park Approved, not yet built · 15 MW
Jul 2022 8.0 km away Rooftop solar Optima Products, Mill Road - Solar Panels Approved, not yet built · 300 kW
May 2023 8.2 km away Rooftop solar St Laurence School, Ashley Road - Solar Panels Approved, not yet built · 190 kW
Apr 2025 8.3 km away Rooftop solar Stowford Manor Farm, Farleigh Road - Solar Panels Approved, not yet built · 160 kW
Jul 2023 8.6 km away Solar farm Fairy Hill, Compton Dando - Solar Farm Approved, not yet built · 2 MW
Jul 2025 9.4 km away Rooftop solar Wellsway School, Chandag Road - PV Arrays Approved, not yet built · 150 kW
Sept 2024 9.5 km away Battery storage Road and street works within 1 km 2 permitted works running now or planned.
Standard Frome Road, Bath Highway repair and maintenance works · BATH AND NORTH EAST SOMERSET COUNCIL · Some carriageway incursion
Jan 2027 to Jan 2027 500 m away Minor Barrow Road, Bath Utility asset works · BT · Give and take
Oct 2026 to Oct 2026 400 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Examination application due September 2025 26.6 km away Decided decided Jan 2016 27.6 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Hunstrete (Wilmington Farm) (solar farm, 8.7 km); Kingston Farm (solar farm, 9.4 km); Chelwood Solar Farm (solar farm, 9.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.