Country England and Wales › Region South West › Council Wiltshire › Neighbourhood Staverton, Hilperton & Semington › Postcode BA14 7TN What's changing near BA14 7TN Within 2 km, around Staverton, Hilperton & Semington in Wiltshire. Building, planning, schools, transport, prices and crime.
261 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-0.8% like-for-like prices in Staverton, Hilperton & Semington, 2024 → 2025 (council +2.1%)
+5% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 26 new homes completed houses · Nov 2025 – Oct 2026
Oct 2026 1.2 km away New homes 19 new homes completed houses · Aug 2025 – Sep 2026
Sept 2026 1.3 km away New homes 43 new homes completed houses · Feb 2025 – Sep 2026
Sept 2026 1.7 km away New homes 25 new homes completed houses · Nov 2025 – Sep 2026
Sept 2026 1.3 km away New homes 18 new homes completed houses · Feb 2026 – Jul 2026
Jul 2026 1.5 km away New homes 14 new homes completed houses · Aug 2025 – May 2026
May 2026 1.4 km away New homes 15 new homes completed houses · Sep 2025 – May 2026
May 2026 1.3 km away New homes 6 new homes completed houses · Dec 2025 – Apr 2026
Apr 2026 1.3 km away New homes 21 new homes completed houses · Nov 2025 – Apr 2026
Apr 2026 1.2 km away New homes 18 new homes completed houses · Oct 2025 – Apr 2026
Apr 2026 1.9 km away New homes 13 new homes completed houses · Jun 2025 – Feb 2026
Feb 2026 1.6 km away New homes 19 new homes completed 6 flats, 13 houses · Mar 2025 – Oct 2025
Oct 2025 1.6 km away 4 homes extended 2021–2025, typically adding 39 m²
9 since energy certificates began (2008)
4 in BA14 7TN itself
Extended certificate 2025 Extended certificate 2025 Extended certificate 2015 Extended certificate 2009 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 26 planned, approved or being built and 20 running (224 MW between them). Those within 5 km are on the map above.
Solar farm Whaddon Lane, Hilperton Approved, not yet built · 25 MW
Apr 2022 2.1 km away Battery storage Whaddon Lane, Hilperton Approved, not yet built · 18 MW
Apr 2022 2.1 km away Rooftop solar Apetito, Canal Road - Solar Panels Approved, not yet built · 720 kW
Sept 2024 2.2 km away Rooftop solar Apetito, Canal Road - Solar Panels Approved, not yet built · 1 MW
Sept 2024 2.2 km away Rooftop solar Tesco, County Way - Solar Photovoltaic Panels Approved, not yet built · 150 kW
Mar 2026 2.6 km away Rooftop solar Herman Miller, Portal Road - Solar Panels Approved, not yet built · 580 kW
Apr 2023 3.7 km away Rooftop solar Knorr Bremse Rail Systems Uk, Westinghouse Way - Solar Panels Approved, not yet built · 420 kW
Jun 2026 3.8 km away Rooftop solar Wiltshire college, College Road - Solar Panels Approved, not yet built · 160 kW
Jan 2023 4.2 km away Battery storage Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility Approved, not yet built · 150 MW
Jan 2023 5.0 km away Solar farm Whistle Mead Solar Farm, Little Chalfield - Solar Farm Planning application in
Mar 2023 5.9 km away Road and street works within 1 km 1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Examination application due September 2025 24.7 km away Decided A303 Stonehenge Highways · Linear route between Amesbury and Berwick Down, Wiltshire decided Jul 2023 28.0 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Land north of Ashton Road (solar farm, 1.6 km); Marsh Farm Hilperton (solar farm, 1.6 km); Trowbridge Sewage Treatment Works (other, 3.2 km); Cockhill Solar Farm (solar farm, 3.6 km); Trowle Common (solar farm, 4.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.