What's changing near BA12 9LB
Within 2 km, around Warminster East in Wiltshire. Building, planning, schools, transport, prices and crime.
5new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-5.8%like-for-like prices in Warminster East, 2024 → 2025 (council +2.1%)
-19%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 3 postcodes nearby had new homes completed in the last two years.
18homes extended 2021–2025, typically adding 32 m²
22since energy certificates began (2008)
1in BA12 9LB itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
349hours of spills in 2025 between them (typical neighbourhood: about 36)
102spill events counted
- Wessex Water
Warminster Wwtwinto River Wylye18 spills, 238 hours in 2025
1.1 km away - Wessex Water
Lake Pleasure Gardens Csointo River Wyle Via The Were (Sws)45 spills, 55 hours in 2025
900 m away - Wessex Water
Calveswater Pumping Stationinto The Were Via Sws22 spills, 51 hours in 2025
300 m away - Wessex Water
Not Applicableinto River Wyle Via The Were (Sws)14 spills, 5 hours in 2025
900 m away - Wessex Water
George Street Csointo The Were3 spills, 1 hours in 2025
1.2 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
7 planned, approved or being built and 4 running (15 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Morrisons, Weymouth Street - Solar PanelsApproved, not yet built · 230 kW
Dec 2022
1000 m away - Solar farm
Lodge Hill, Berkley - Solar ParkApproved, not yet built · 15 MW
Oct 2022
7.8 km away - Solar farm
Westbury Sewage Treatment Works, Slag Lane - Solar PanelsApproved, not yet built
Oct 2022
7.9 km away - Solar farm
Storridge Road - Solar FarmApproved, not yet built · 31 MW
Oct 2023
8.6 km away - Battery storage
Storridge Road - Battery StorageApproved, not yet built
Oct 2023
8.6 km away - Rooftop solar
Washington Road, West Wilts Trading Estate - Solar PanelsApproved, not yet built · 180 kW
Sept 2024
8.8 km away - Battery storage
Frome Power, Styles Close - Energy Storage FacilityPlanning application in · 30 MW
Jun 2023
9.9 km away
Running nearest: Westbury Landfill Scheme (landfill gas, 8.1 km); Westbury (Closed) Landfill Site (solar farm, 8.2 km); Blenches Mill (solar farm, 8.5 km); Brook Hall Farm (solar farm, 9.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
- Major, planned
Ferris Mead, WarminsterHighway repair and maintenance works · WILTSHIRE COUNCIL · Road closure
Nov 2026 to Nov 2026
850 m away - Major
Ferris Mead, WarminsterHighway repair and maintenance works · WILTSHIRE COUNCIL · Road closure
Nov 2026 to Nov 2026
850 m away - Minor
Highbury Park, WarminsterHighway repair and maintenance works · WILTSHIRE COUNCIL · Some carriageway incursion
Nov 2026 to Nov 2026
250 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
A303 StonehengeHighways · Linear route between Amesbury and Berwick Down, Wiltshire decided Jul 2023
21.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.