Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
349hours of spills in 2025 between them (typical neighbourhood: about 36)
102spill events counted
Wessex Water
Warminster Wwtwinto River Wylye18 spills, 238 hours in 2025
1.8 km away
Wessex Water
Lake Pleasure Gardens Csointo River Wyle Via The Were (Sws)45 spills, 55 hours in 2025
750 m away
Wessex Water
Calveswater Pumping Stationinto The Were Via Sws22 spills, 51 hours in 2025
1.2 km away
Wessex Water
Not Applicableinto River Wyle Via The Were (Sws)14 spills, 5 hours in 2025
750 m away
Wessex Water
George Street Csointo The Were3 spills, 1 hours in 2025
7 planned, approved or being built and 5 running (20 MW between them). Those within 5 km are on the map above.
Rooftop solar
Morrisons, Weymouth Street - Solar PanelsApproved, not yet built · 230 kW
Dec 2022 650 m away
Solar farm
Westbury Sewage Treatment Works, Slag Lane - Solar PanelsApproved, not yet built
Oct 2022 6.9 km away
Solar farm
Lodge Hill, Berkley - Solar ParkApproved, not yet built · 15 MW
Oct 2022 7.1 km away
Solar farm
Storridge Road - Solar FarmApproved, not yet built · 31 MW
Oct 2023 7.7 km away
Battery storage
Storridge Road - Battery StorageApproved, not yet built
Oct 2023 7.7 km away
Rooftop solar
Washington Road, West Wilts Trading Estate - Solar PanelsApproved, not yet built · 180 kW
Sept 2024 7.9 km away
Battery storage
Frome Power, Styles Close - Energy Storage FacilityPlanning application in · 30 MW
Jun 2023 9.3 km away
Running nearest: Westbury Landfill Scheme (landfill gas, 7.2 km); Westbury (Closed) Landfill Site (solar farm, 7.4 km); Blenches Mill (solar farm, 7.6 km); Brook Hall Farm (solar farm, 8.6 km); Land West Side of Axe and Cleaver Lane (solar farm, 9.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
5 permitted works running now or planned.
Minor
Portway, WarminsterHighway repair and maintenance works · WILTSHIRE COUNCIL · Some carriageway incursion
Nov 2026 to Nov 2026 500 m away
Minor
High Street, WarminsterUtility repair and maintenance works · WESSEX WATER · Multi-way signals
Oct 2026 to Oct 2026 650 m away
Minor
Highbury Park, WarminsterHighway repair and maintenance works · WILTSHIRE COUNCIL · Some carriageway incursion
Nov 2026 to Nov 2026 700 m away
Minor
Quantock Close, WarminsterRemedial works · WALES AND WEST UTILITIES LTD · Some carriageway incursion
Nov 2026 to Nov 2026 900 m away
Minor
Portway Lane, WarminsterHighway repair and maintenance works · WILTSHIRE COUNCIL · Some carriageway incursion
Nov 2026 to Nov 2026 1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
A303 StonehengeHighways · Linear route between Amesbury and Berwick Down, Wiltshire
decided Jul 2023 22.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Warminster East: +13% over five years (2020 → 2025).
Council tax list: 40 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.4% in two years.