What's changing near BA12 0AN
Within 2 km, around Warminster West & North in Wiltshire. Building, planning, schools, transport, prices and crime.
146new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.4%like-for-like prices in Warminster West & North, 2024 → 2025 (council +2.1%)
-16%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
38 new homes completedhouses · May 2025 – Oct 2026
planned Oct 2026
1.1 km away - New homes
19 new homes completed9 flats, 10 houses · Jun 2026 – Sep 2026
Sept 2026
1.2 km away - New homes
24 new homes completedhouses · Nov 2025 – May 2026
May 2026
1.1 km away - New homes
24 new homes completedhouses · May 2025 – Mar 2026
Mar 2026
1.1 km away - New homes
22 new homes completedhouses · Aug 2025 – Dec 2025
Dec 2025
1.1 km away - New homes
14 new homes completedhouses · Jun 2025 – Oct 2025
Oct 2025
1.1 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
13homes extended 2021–2025, typically adding 22 m²
21since energy certificates began (2008)
4in BA12 0AN itself
- Extendedcertificate 2024
- Extendedcertificate 2022
- Extendedcertificate 2020
- Extendedcertificate 2014
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
111hours of spills in 2025 between them (typical neighbourhood: about 36)
84spill events counted
- Wessex Water
Lake Pleasure Gardens Csointo River Wyle Via The Were (Sws)45 spills, 55 hours in 2025
950 m away - Wessex Water
Calveswater Pumping Stationinto The Were Via Sws22 spills, 51 hours in 2025
1.7 km away - Wessex Water
Not Applicableinto River Wyle Via The Were (Sws)14 spills, 5 hours in 2025
950 m away - Wessex Water
George Street Csointo The Were3 spills, 1 hours in 2025
700 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
10 planned, approved or being built and 7 running (32 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Morrisons, Weymouth Street - Solar PanelsApproved, not yet built · 230 kW
Dec 2022
800 m away - Solar farm
Westbury Sewage Treatment Works, Slag Lane - Solar PanelsApproved, not yet built
Oct 2022
6.4 km away - Solar farm
Lodge Hill, Berkley - Solar ParkApproved, not yet built · 15 MW
Oct 2022
6.6 km away - Solar farm
Storridge Road - Solar FarmApproved, not yet built · 31 MW
Oct 2023
7.1 km away - Battery storage
Storridge Road - Battery StorageApproved, not yet built
Oct 2023
7.1 km away - Rooftop solar
Washington Road, West Wilts Trading Estate - Solar PanelsApproved, not yet built · 180 kW
Sept 2024
7.3 km away - Battery storage
Frome Power, Styles Close - Energy Storage FacilityPlanning application in · 30 MW
Jun 2023
8.8 km away - Solar farm
Hoopers Pool, Southwick - Solar PanelsPlanning application in · 30 MW
May 2025
9.8 km away - Solar farm
Bluebell Wood Solar Farm & Battery StorageApproved, not yet built · 50 MW
Jul 2024
9.9 km away - Battery storage
Bluebell Wood Solar Farm & Battery StorageApproved, not yet built · 50 MW
Jul 2024
9.9 km away
Running nearest: Westbury Landfill Scheme (landfill gas, 6.8 km); Westbury (Closed) Landfill Site (solar farm, 7.0 km); Blenches Mill (solar farm, 7.0 km); Brook Hall Farm (solar farm, 8.0 km); Land West Side of Axe and Cleaver Lane (solar farm, 9.2 km).
Road and street works within 1 km
6 permitted works running now or planned.
- Minor
Quantock Close, WarminsterRemedial works · WALES AND WEST UTILITIES LTD · Some carriageway incursion
Nov 2026 to Nov 2026
300 m away - Minor
Portway Lane, WarminsterHighway repair and maintenance works · WILTSHIRE COUNCIL · Some carriageway incursion
Nov 2026 to Nov 2026
400 m away - Minor
Portway, WarminsterHighway repair and maintenance works · WILTSHIRE COUNCIL · Some carriageway incursion
Nov 2026 to Nov 2026
450 m away - Immediate - urgent
Arn View, WarminsterOptional permit (no fee) e.g. for traffic management etc · WILTSHIRE COUNCIL · No carriageway incursion
Sept 2026 to Dec 2026
500 m away - Minor
Arn View, WarminsterHighway repair and maintenance works · WILTSHIRE COUNCIL · Some carriageway incursion
Nov 2026 to Nov 2026
550 m away - Minor
High Street, WarminsterUtility repair and maintenance works · WESSEX WATER · Multi-way signals
Oct 2026 to Oct 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
A303 StonehengeHighways · Linear route between Amesbury and Berwick Down, Wiltshire decided Jul 2023
22.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.