Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
16storm overflows within 2 km
293hours of spills in 2025 between them (typical neighbourhood: about 36)
274spill events counted
Wessex Water
Adderwell Close Csointo River Frome (Via Sws)58 spills, 107 hours in 2025
1.0 km away
Wessex Water
Lower Keyford Csointo Trib Of River Frome (Via Sws)58 spills, 81 hours in 2025
1.5 km away
Wessex Water
Frome Wastewater Treatment Worksinto River Frome(S)22 spills, 60 hours in 2025
1.7 km away
Wessex Water
Wallbridge Combined Sewer Overflowinto River Frome3 spills, 11 hours in 2025
300 m away
Wessex Water
Whatcombe Road Csointo River Frome Via Sws31 spills, 10 hours in 2025
1.7 km away
Wessex Water
Youth Centre Csointo River Frome21 spills, 7 hours in 2025
1.9 km away
Wessex Water
Court House Combined Sewer Overflowinto River Frome19 spills, 6 hours in 2025
1.1 km away
Wessex Water
Merchants Barton Csointo River Frome (Via Sws)17 spills, 4 hours in 2025
14 planned, approved or being built and 8 running (46 MW between them). Those within 5 km are on the map above.
Battery storage
Frome Power, Styles Close - Energy Storage FacilityPlanning application in · 30 MW
Jun 2023 0 m away
Rooftop solar
Marston Trading Estate, Manor Furlong - Solar PanelsApproved, not yet built · 810 kW
Apr 2025 2.0 km away
Solar farm
Lodge Hill, Berkley - Solar ParkApproved, not yet built · 15 MW
Oct 2022 2.5 km away
Solar farm
Bluebell Wood Solar Farm & Battery StorageApproved, not yet built · 50 MW
Jul 2024 6.8 km away
Battery storage
Bluebell Wood Solar Farm & Battery StorageApproved, not yet built · 50 MW
Jul 2024 6.8 km away
Rooftop solar
RAP Shed, Colemans Quarry - Solar PanelsApproved, not yet built
Oct 2025 6.9 km away
Solar farm
Storridge Road - Solar FarmApproved, not yet built · 31 MW
Oct 2023 7.4 km away
Battery storage
Storridge Road - Battery StorageApproved, not yet built
Oct 2023 7.4 km away
Solar farm
Hoopers Pool, Southwick - Solar PanelsPlanning application in · 30 MW
May 2025 7.6 km away
Rooftop solar
Washington Road, West Wilts Trading Estate - Solar PanelsApproved, not yet built · 180 kW
Sept 2024 8.1 km away
Solar farm
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
Major
Berkley Road, FromeUtility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · No carriageway incursion
Jul 2026 to Nov 2026 650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Frome North East: +22% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -2.3% in two years.