Country England and Wales › Region West Midlands › Council Birmingham › Neighbourhood Minworth › Postcode B76 9BD What's changing near B76 9BD Within 2 km, around Minworth in Birmingham. Building, planning, schools, transport, prices and crime.
10 new homes completed within 2 km, last 2 years
22 homes given permission on brownfield sites since 2021
-3.0% like-for-like prices in Minworth, 2024 → 2025 (council +3.3%)
+4% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 8 new homes completed houses · Apr 2026
Apr 2026 1.9 km away Planning permission Aug 2024 1000 m away School closed School closed: Sunflower Meadow Farm School Other independent special school, other independent special school (closure)
Mar 2024 1.4 km away Planning permission Mar 2024 750 m away Planning permission Permission for 2 homes Land adjacent to, Kimal, Old Kingsbury Road, Sutton Coldfield, Birmingham (full planning permission) Nov 2023 600 m away New school New school: Sunflower Meadow Farm School Other independent special school, other independent special school
Mar 2023 1.4 km away Planning permission Aug 2022 1.1 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 3 postcodes nearby had new homes completed in the last two years.
10 homes extended 2021–2025, typically adding 21 m²
16 since energy certificates began (2008)
6 in B76 9BD itself
Extended certificate 2026 Extended certificate 2025 Extended certificate 2024 Extended certificate 2022 Extended certificate 2021 Extended certificate 2020 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 5 storm overflows within 2 km
225 hours of spills in 2025 between them (typical neighbourhood: about 36)
27 spill events counted
Severn Trent Water Minworth Sewage Treatment Works into River Tame 24 spills, 190 hours in 2025
700 m away Severn Trent Water Curdworth Pumping Station (Cso) into River Tame 3 spills, 34 hours in 2025
1.6 km away Severn Trent Water Castle Vale - Kingsbury Road (Cso) into Plants Brook 0 spills, 0 hours in 2025
1.5 km away Severn Trent Water Birmingham Road Storm Overflow into Trib Of River Tame 0 spills, 0 hours in 2025
1.7 km away Severn Trent Water Tyburn - 128 Hansons Bridge Road So into Plants Brook 0 spills, 0 hours in 2025
2.0 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 70 planned, approved or being built and 5 running (61 MW between them). Those within 5 km are on the map above.
Rooftop solar Hozelock, Midpoint Park - Solar Panels Planning application in · 160 kW
May 2026 500 m away Rooftop solar Premier Paper, Midpoint Park - Solar Panels Approved, not yet built · 260 kW
Jan 2026 700 m away Rooftop solar WHS Plastics, Water Orton Lane - Solar Panels Approved, not yet built · 1 MW
Dec 2024 1.1 km away Battery storage Wishaw Lane, Sutton Coldfield - Battery Energy Storage Planning application in · 50 MW
Dec 2024 1.6 km away Battery storage Maybrook Road - Battery facility Approved, not yet built · 13 MW
Aug 2022 1.6 km away Rooftop solar Park Hall Academy, Water Orton Road - Solar Panels Approved, not yet built · 300 kW
Jun 2026 1.6 km away Rooftop solar Cembre Limited Dunton Park, Kingsbury Road Approved, not yet built · 940 kW
Apr 2023 2.4 km away Battery storage Lichfield Road, Watton Lane - Battery Storage Approved, not yet built · 50 MW
Mar 2024 2.6 km away Rooftop solar Buzz Bingo, Kingsbury Road - Solar panels Approved, not yet built · 500 kW
Oct 2023 2.8 km away Energy from waste Fort Industrial Park (Castle Bromwich) Approved, not yet built · 10 MW
Jun 2016 2.8 km away Road and street works within 1 km 15 permitted works running now or planned, 13 of them major.
Major, planned Cottage Lane, Sutton Coldfield Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Nov 2026 to Dec 2026 500 m away Major Cottage Lane, Sutton Coldfield Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Nov 2026 to Dec 2026 500 m away Major, planned Longley Avenue, Sutton Coldfield Utility asset works · CADENT GAS LIMITED · Give and take
Nov 2026 to Dec 2026 500 m away Major Longley Avenue, Sutton Coldfield Utility asset works · CADENT GAS LIMITED · Give and take
Nov 2026 to Dec 2026 500 m away Major, planned Kimberley Walk, Sutton Coldfield Utility asset works · CADENT GAS LIMITED · Give and take
Nov 2026 to Dec 2026 550 m away Major Kimberley Walk, Sutton Coldfield Utility asset works · CADENT GAS LIMITED · Give and take
Nov 2026 to Dec 2026 550 m away Major, planned Coneybury Walk, Sutton Coldfield Utility asset works · CADENT GAS LIMITED · Give and take
Nov 2026 to Nov 2026 550 m away Major Coneybury Walk, Sutton Coldfield Utility asset works · CADENT GAS LIMITED · Give and take
Nov 2026 to Nov 2026 550 m away Major, planned Longley Avenue, Sutton Coldfield Utility asset works · CADENT GAS LIMITED · Give and take
Nov 2026 to Nov 2026 600 m away Major infrastructure projects within 30 km Decided decided May 2020 9.7 km away Decided decided Oct 2013 23.8 km away Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 25.3 km away Decided decided Feb 2026 25.8 km away Decided decided Jun 2025 25.8 km away Decided decided May 2020 29.8 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Transport HS2: Interchange station (Solihull) Under construction, near the NEC and Birmingham Airport
under construction 8.9 km away Transport HS2: Birmingham Curzon Street station Under construction
under construction 9.6 km away Running nearest: Minsworth Sewage Treatment Works (other, 1.1 km); Coleshill STW (Waste AD) (anaerobic digestion, 3.8 km); Packington Generation Plant Phase 3 (landfill gas, 8.0 km); Birmingham Bio-Power Plant (energy from waste, 8.7 km); Tyseley ERF (energy from waste, 9.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.