Country England and Wales › Region West Midlands › Council Birmingham › Neighbourhood Rectory Park & New Hall Valley › Postcode B76 2PF What's changing near B76 2PF Within 2 km, around Rectory Park & New Hall Valley in Birmingham. Building, planning, schools, transport, prices and crime.
46 new homes completed within 2 km, last 2 years
207 homes given permission on brownfield sites since 2021
-1.9% like-for-like prices in Rectory Park & New Hall Valley, 2024 → 2025 (council +3.3%)
-12% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first 13 homes extended 2021–2025, typically adding 27 m²
29 since energy certificates began (2008)
0 in B76 2PF itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 64 planned, approved or being built and 3 running (13 MW between them). Those within 5 km are on the map above.
Rooftop solar Good Hope Hospital, Rectory Road - Solar Panels Planning application in · 510 kW
Jun 2026 2.2 km away Battery storage Maybrook Road - Battery facility Approved, not yet built · 13 MW
Aug 2022 2.3 km away Rooftop solar Premier Paper, Midpoint Park - Solar Panels Approved, not yet built · 260 kW
Jan 2026 3.1 km away Rooftop solar Hozelock, Midpoint Park - Solar Panels Planning application in · 160 kW
May 2026 3.1 km away Battery storage Wishaw Lane, Sutton Coldfield - Battery Energy Storage Planning application in · 50 MW
Dec 2024 3.3 km away Rooftop solar Buzz Bingo, Kingsbury Road - Solar panels Approved, not yet built · 500 kW
Oct 2023 3.6 km away Energy from waste Fort Industrial Park (Castle Bromwich) Approved, not yet built · 10 MW
Jun 2016 4.2 km away Rooftop solar Cembre Limited Dunton Park, Kingsbury Road Approved, not yet built · 940 kW
Apr 2023 4.5 km away Rooftop solar WHS Plastics, Water Orton Lane - Solar Panels Approved, not yet built · 1 MW
Dec 2024 4.5 km away Rooftop solar Fort Shopping Park, Fort Parkway - Solar PV Panels Approved, not yet built · 2 MW
Sept 2023 4.8 km away Road and street works within 1 km 3 permitted works running now or planned, 2 of them major.
Major, planned Signal Hayes Road, Sutton Coldfield Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Nov 2026 250 m away Major Signal Hayes Road, Sutton Coldfield Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Nov 2026 250 m away Standard The Willows, Sutton Coldfield Utility asset works · National Grid Electricity Distribution (West Midlands) · Some carriageway incursion
Oct 2026 to Oct 2026 200 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2020 13.1 km away Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 22.0 km away Decided decided Jun 2025 24.0 km away Decided decided Oct 2013 25.0 km away Decided decided May 2020 26.5 km away Decided decided Feb 2026 29.0 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Transport HS2: Birmingham Curzon Street station Under construction
under construction 9.7 km away Transport HS2: Interchange station (Solihull) Under construction, near the NEC and Birmingham Airport
under construction 12.2 km away Running nearest: Minsworth Sewage Treatment Works (other, 3.6 km); Coleshill STW (Waste AD) (anaerobic digestion, 6.8 km); Wilnecote Landfill Site (landfill gas, 9.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.