What's changing near B75 5UH
Within 2 km, around Little Sutton & Roughley in Birmingham. Building, planning, schools, transport, prices and crime.
27new homes completed within 2 km, last 2 years
35homes given permission on brownfield sites since 2021
-0.1%like-for-like prices in Little Sutton & Roughley, 2024 → 2025 (council +3.3%)
-9%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
25homes extended 2021–2025, typically adding 30 m²
44since energy certificates began (2008)
3in B75 5UH itself
- Extendedcertificate 2026
- Extendedcertificate 2021
- Extendedcertificate 2020
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
138hours of spills in 2025 between them (typical neighbourhood: about 36)
26spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
39 planned, approved or being built and 3 running (12 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Good Hope Hospital, Rectory Road - Solar PanelsPlanning application in · 510 kW
Jun 2026
2.7 km away - Rooftop solar
Little Aston Hospital, Little Aston Hall Drive - Solar panelsApproved, not yet built · 200 kW
May 2024
4.6 km away - Rooftop solar
David Lloyd Clubs, Birmingham Road - Solar PanelsPlanning application in
Jul 2025
7.0 km away - Battery storage
Maybrook Road - Battery facilityApproved, not yet built · 13 MW
Aug 2022
7.0 km away - Battery storage
Wishaw Lane, Sutton Coldfield - Battery Energy StoragePlanning application in · 50 MW
Dec 2024
7.0 km away - Rooftop solar
Erdington Road, Aldridge - Solar PanelsApproved, not yet built · 320 kW
May 2022
7.1 km away - Rooftop solar
Farrow Road Industrial Estate, Farrow Road - Solar PanelsApproved, not yet built · 180 kW
Apr 2023
7.2 km away - Rooftop solar
David Lloyd Leisure Centre, Shady Lane - Solar PanelsApproved, not yet built · 300 kW
Mar 2024
7.4 km away - Rooftop solar
Hozelock, Midpoint Park - Solar PanelsPlanning application in · 160 kW
May 2026
7.7 km away - Rooftop solar
Premier Paper, Midpoint Park - Solar PanelsApproved, not yet built · 260 kW
Jan 2026
7.7 km away
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
- Major, planned
Weeford Road, Sutton ColdfieldHighway improvement works · BIRMINGHAM CITY COUNCIL · Road closure
Jan 2027 to Feb 2027
500 m away - Major
Duttons Lane, Sutton ColdfieldRemedial works · CADENT GAS LIMITED · Road closure
Nov 2026 to Nov 2026
550 m away - Minor
Roughley Farm Road, Sutton ColdfieldHighway improvement works · BIRMINGHAM CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
400 m away - Minor
Rowallan Road, Sutton ColdfieldHighway improvement works · BIRMINGHAM CITY COUNCIL · Road closure
Nov 2026 to Dec 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2020
17.6 km away - Decided
M54 to M6 Link RoadHighways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022
19.3 km away - Decideddecided Jun 2025
20.1 km away - Decideddecided May 2020
23.5 km away - Decideddecided Oct 2013
28.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
- Transport
HS2: Birmingham Curzon Street stationUnder construction
under construction
13.4 km away - Transport
HS2: Interchange station (Solihull)Under construction, near the NEC and Birmingham Airport
under construction
16.8 km away
Running nearest: Minsworth Sewage Treatment Works (other, 7.6 km); Wilnecote Landfill Site (landfill gas, 8.5 km); Highfields South Landfill Gas (landfill gas, 9.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.