Within 2 km, around Smethwick South in Sandwell. Building, planning, schools, transport, prices and crime.
49new homes completed within 2 km, last 2 years
964homes given permission on brownfield sites since 2021
-0.3%like-for-like prices in Smethwick South, 2024 → 2025 (council +5.3%)
+5%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New school
New school: George Dixon PrimaryAcademy sponsor led, primary
planned Jan 2027
1.6 km away - New homes
14 new homes completedflats · Mar 2026
Apr 2026
1.5 km away - New homes
5 new homes completedflats · Mar 2026
Mar 2026
1.5 km away - New homes
5 new homes completedflats · Dec 2025
Dec 2025
2.0 km away - New homes
9 new homes completedflats · Jan 2025
Jan 2025
1.5 km away - New homes
9 new homes completedflats · Jan 2025
Jan 2025
1.5 km away - Planning permissionOct 2023
1.9 km away - Planning permissionSept 2023
1.8 km away - School closed
School closed: The Regis AcademyOther independent school, other independent school (closure)
Jul 2023
1.1 km away - Planning permissionJun 2023
1.4 km away
18homes extended 2021–2025, typically adding 28 m²
58since energy certificates began (2008)
2in B67 6EW itself
- Extendedcertificate 2016
- Extendedcertificate 2016
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
20storm overflows within 2 km
137hours of spills in 2025 between them (typical neighbourhood: about 36)
124spill events counted
- Severn Trent Water
Rabone Lane (No.1) Csointo Hockley Brook17 spills, 24 hours in 2025
1.1 km away - Severn Trent Water
Londonderry Lane Csointo Stoney Brook Via Sws16 spills, 20 hours in 2025
700 m away - Severn Trent Water
Baldwin Street Csointo Hockley Brook11 spills, 19 hours in 2025
1000 m away - Severn Trent Water
Smethick - High St./Water Ln. Csointo Thimblemill Brook (Culvert)5 spills, 15 hours in 2025
250 m away - Severn Trent Water
Anderson Road Csointo Chad Brook20 spills, 14 hours in 2025
2.0 km away - Severn Trent Water
Cape Hill Combined Sewer Overflowinto Hockley Brook10 spills, 12 hours in 2025
1.5 km away - Severn Trent Water
Cemetery Rd-Victoria Rd Csointo Tributary Of Birmingham Canal9 spills, 12 hours in 2025
2.0 km away - Severn Trent Water
Stanhope Road/Davison Road Jct Csointo Thimblemill Brook9 spills, 8 hours in 2025
600 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
96 planned, approved or being built and 9 running (199 MW between them). Those within 5 km are on the map above.
- Rooftop solar
First Steps Nursery, Waterloo Road - Solar PanelsApproved, not yet built · 300 kW
Feb 2024
650 m away - Rooftop solar
Guru Nanak Gurdwara, High Street - Solar PanelsApproved, not yet built · 210 kW
Nov 2024
750 m away - Rooftop solar
Devonshire Infant & Junior Academies, Auckland Road - Solar PanelsApproved, not yet built · 260 kW
Jul 2025
750 m away - Rooftop solar
Ash And Lacy, Alma Street - Photovoltaic Solar PanelsApproved, not yet built · 240 kW
Oct 2024
1.5 km away - Rooftop solar
Lansing Linde Creighton Limited, Dartmouth Road - Solar PanelsApproved, not yet built · 200 kW
Jan 2026
1.7 km away - Rooftop solar
West Bromwich Albion Football Club - Solar PanelsApproved, not yet built · 700 kW
Sept 2025
2.3 km away - Rooftop solar
Holyhead Road - Roof Mounted Solar PV solar panelsApproved, not yet built · 210 kW
Jul 2024
2.4 km away - Rooftop solar
Holyhead Road - Solar PV PanelsPlanning application in · 400 kW
May 2026
2.4 km away - Battery storage
Tat Bank Road, Western Road - Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025
2.5 km away - Energy from waste
Kelvin Energy Recovery FacilityBeing built · 47 MW
Nov 20212.7 km away
Road and street works within 1 km
7 permitted works running now or planned, 5 of them major.
- Major, planned
Arden Road, SmethwickUtility repair and maintenance works · BT · Road closure
Feb 2027 to Feb 2027
200 m away - Major, planned
High Street, SmethwickHighway improvement works · SANDWELL METROPOLITAN BOROUGH COUNCIL · Two-way signals
Nov 2026 to Dec 2026
500 m away - Major, planned
High Street, SmethwickUtility asset works · Aurora Utilities Limited · Lane closure
Oct 2026 to Oct 2026
600 m away - Major
High Street, SmethwickUtility asset works · Aurora Utilities Limited · Lane closure
Oct 2026 to Oct 2026
600 m away - Major, planned
Grange Road, SmethwickUtility repair and maintenance works · BT · Road closure
Nov 2026 to Nov 2026
650 m away - Standard
Corbett Street, SmethwickUtility asset works · Aurora Utilities Limited · Some carriageway incursion
Oct 2026 to Oct 2026
550 m away - Standard
Cape Hill, SmethwickUtility repair and maintenance works · National Grid Electricity Distribution (West Midlands) · No carriageway incursion
Oct 2026 to Oct 2026
800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2013
15.4 km away - Decideddecided May 2020
18.3 km away - Decided
M54 to M6 Link RoadHighways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022
19.4 km away - Decideddecided May 2020
24.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
- Transport
HS2: Birmingham Curzon Street stationUnder construction
under construction
5.6 km away - Transport
HS2: Interchange station (Solihull)Under construction, near the NEC and Birmingham Airport
under construction
17.6 km away
Running nearest: DPD Distribution Centre (rooftop solar, 3.3 km); Oldbury (energy from waste, 5.0 km); Edwin Richards Landfill Scheme (landfill gas, 6.1 km); Bustleholme Substation (battery storage, 7.2 km); Golds Hill - Battery Storage (battery storage, 7.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.