What's changing near B63 1HU
Within 2 km, around Hayley Green in Dudley. Building, planning, schools, transport, prices and crime.
1new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.9%like-for-like prices in Hayley Green, 2024 → 2025 (council +4.2%)
-22%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
14homes extended 2021–2025, typically adding 34 m²
23since energy certificates began (2008)
1in B63 1HU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
32hours of spills in 2025 between them (typical neighbourhood: about 36)
22spill events counted
- Severn Trent Water
Halesowen – Meadowbrook Road No.49 (Cso)into Unnamed Tributary Of Lutley Gutter17 spills, 24 hours in 2025
850 m away - Severn Trent Water
Fallowfield Road Csointo Tributary Of Lutley Gutter5 spills, 8 hours in 2025
700 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
43 planned, approved or being built and 9 running (58 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Windsor High School And Sixth Form - Solar panelsApproved, not yet built
Apr 2021
2.0 km away - Rooftop solar
M J Sections Limited, Stourbridge Road - Solar PanelsApproved, not yet built
Nov 2025
2.2 km away - Rooftop solar
Halesowen Leisure Centre, Great Cornbow - Solar PanelsApproved, not yet built · 180 kW
Apr 2023
2.4 km away - Battery storage
Illey Lane - Battery Energy StorageApproved, not yet built · 70 MW
Oct 2025
2.4 km away - Rooftop solar
Newfield Park Primary School, Whittingham Road - Solar PanelsApproved, not yet built · 160 kW
Sept 2024
2.6 km away - Rooftop solar
Halesowen College, Whittingham Road - Solar PanelsApproved, not yet built
Jun 2025
2.7 km away - Battery storage
Illeybrook Farm - Battery Energy StorageApproved, not yet built · 100 MW
Feb 2025
3.0 km away - Rooftop solar
Steelpark Road, Unit G1 - Solar PanelsApproved, not yet built
Jul 2025
3.6 km away - Battery storage
Lowlands Farm - Battery StorageApproved, not yet built · 50 MW
Sept 2024
3.7 km away - Rooftop solar
Thorns Collegiate Academy - Solar PanelsApproved, not yet built · 500 kW
Mar 2024
4.1 km away
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2013
12.3 km away - Decided
M54 to M6 Link RoadHighways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022
23.6 km away - Decideddecided May 2020
25.1 km away - Decideddecided May 2020
27.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Running nearest: Cradley Heath (energy from waste, 3.3 km); Edwin Richards Landfill Scheme (landfill gas, 5.8 km); Sandy Lane Generation Plant (landfill gas, 6.1 km); Dudley EfW (energy from waste, 6.8 km); DPD Distribution Centre (rooftop solar, 9.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.