What's changing near B62 9EF
Within 2 km, around Quinton West in Dudley. Building, planning, schools, transport, prices and crime.
41new homes completed within 2 km, last 2 years
23homes given permission on brownfield sites since 2021
+5.9%like-for-like prices in Quinton West, 2024 → 2025 (council +4.2%)
-10%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completed1 flats, 5 houses · Nov 2025
Nov 2025
1.3 km away - New homes
8 new homes completedflats · Nov 2025
Nov 2025
1.3 km away - New homes
8 new homes completedhouses · Mar 2025
Mar 2025
700 m away - Planning permissionMar 2024
1.9 km away - New schoolOct 2023
1.2 km away - Planning permissionJul 2022
700 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
23homes extended 2021–2025, typically adding 27 m²
50since energy certificates began (2008)
0in B62 9EF itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
149hours of spills in 2025 between them (typical neighbourhood: about 36)
54spill events counted
- Severn Trent Water
Long Lane Storm Sewage Overflowinto Tributary Of The River Tame36 spills, 85 hours in 2025
1.2 km away - Severn Trent Water
Cakemore Rd Combined Sewer Overflowinto York Road Brook17 spills, 63 hours in 2025
1.4 km away - Severn Trent Water
Blackheath - Stn Road Storm Tanks (Cso)into York Road Brook1 spills, 1 hours in 2025
1.5 km away - Severn Trent Water
Dudley Road Csointo Illey Brook0 spills, 0 hours in 2025
1.7 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
66 planned, approved or being built and 8 running (115 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Steelpark Road, Unit G1 - Solar PanelsApproved, not yet built
Jul 2025
1.1 km away - Rooftop solar
Halesowen College, Whittingham Road - Solar PanelsApproved, not yet built
Jun 2025
1.8 km away - Rooftop solar
Newfield Park Primary School, Whittingham Road - Solar PanelsApproved, not yet built · 160 kW
Sept 2024
2.0 km away - Rooftop solar
Halesowen Leisure Centre, Great Cornbow - Solar PanelsApproved, not yet built · 180 kW
Apr 2023
2.3 km away - Battery storage
York Road - Micro Energy Storage FacilityApproved, not yet built · 200 kW
May 2026
2.4 km away - Rooftop solar
M J Sections Limited, Stourbridge Road - Solar PanelsApproved, not yet built
Nov 2025
2.4 km away - Rooftop solar
Rowley Regis Community Hospital, Moor Lane - Solar PanelsApproved, not yet built · 270 kW
Jul 2025
2.5 km away - Rooftop solar
Windsor High School And Sixth Form - Solar panelsApproved, not yet built
Apr 2021
2.5 km away - Rooftop solar
NDC Polipak, Garratts Lane - Solar PanelsApproved, not yet built · 700 kW
Jan 2023
2.6 km away - Rooftop solar
Bell Heath Way, Woodgate - Solar PanelsApproved, not yet built · 600 kW
Feb 2023
2.9 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2013
13.3 km away - Decided
M54 to M6 Link RoadHighways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022
21.0 km away - Decideddecided May 2020
21.7 km away - Decideddecided May 2020
25.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Running nearest: Edwin Richards Landfill Scheme (landfill gas, 3.5 km); Cradley Heath (energy from waste, 3.6 km); DPD Distribution Centre (rooftop solar, 4.8 km); Dudley EfW (energy from waste, 5.4 km); Oldbury (energy from waste, 5.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.