Country England and Wales › Region West Midlands › Council Solihull › Neighbourhood Castle Bromwich West › Postcode B36 9DH What's changing near B36 9DH Within 2 km, around Castle Bromwich West in Solihull. Building, planning, schools, transport, prices and crime.
0 new homes completed within 2 km, last 2 years
68 homes given permission on brownfield sites since 2021
-2.7% like-for-like prices in Castle Bromwich West, 2024 → 2025 (council +1.6%)
+1% recorded crime, last 12 months vs the 12 before
On the map
Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first Planning permission Nov 2023 1.2 km away Planning permission Oct 2023 700 m away Planning permission Permission for 7 homes Land at the former Pines School, Dreghorn Road, Bromford, Birmingham, B36 8LL (full planning permission) Feb 2023 850 m away Planning permission Jan 2023 1.4 km away Planning permission Dec 2022 1.9 km away Planning permission Aug 2022 1.5 km away Planning permission Permission for 18 homes Brookmeadow Public House, 85 Old Forest Way, Shard End, Birmingham, B34 6TW (outline planning permission) Jul 2022 1.5 km away Planning permission 9 homes extended 2021–2025, typically adding 28 m²
23 since energy certificates began (2008)
1 in B36 9DH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 5 storm overflows within 2 km
375 hours of spills in 2025 between them (typical neighbourhood: about 36)
99 spill events counted
Severn Trent Water Chipperfield Road Cso into A Trib Of River Tame 90 spills, 353 hours in 2025
1.3 km away Severn Trent Water Tyburn Road Combined Storm Overflow into Tributary Of River Tame 9 spills, 23 hours in 2025
1.1 km away Severn Trent Water Castle Vale - Kingsbury Road (Cso) into Plants Brook 0 spills, 0 hours in 2025
1.1 km away Severn Trent Water Woodcote Road Cso into Tributary Of River Tame 0 spills, 0 hours in 2025
1.1 km away Severn Trent Water Cole Valley Eastern Sewer into River Cole 0 spills, 0 hours in 2025
1.5 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 74 planned, approved or being built and 5 running (61 MW between them). Those within 5 km are on the map above.
Energy from waste Fort Industrial Park (Castle Bromwich) Approved, not yet built · 10 MW
Jun 2016 1000 m away Rooftop solar Buzz Bingo, Kingsbury Road - Solar panels Approved, not yet built · 500 kW
Oct 2023 1.6 km away Rooftop solar Park Hall Academy, Water Orton Road - Solar Panels Approved, not yet built · 300 kW
Jun 2026 1.7 km away Rooftop solar Premier Paper, Midpoint Park - Solar Panels Approved, not yet built · 260 kW
Jan 2026 2.2 km away Rooftop solar Vertik-Al,Yardley Brook Industrial Park - Solar Panels Approved, not yet built · 530 kW
Dec 2022 2.2 km away Rooftop solar Fort Shopping Park, Fort Parkway - Solar PV Panels Approved, not yet built · 2 MW
Sept 2023 2.3 km away Rooftop solar Hozelock, Midpoint Park - Solar Panels Planning application in · 160 kW
May 2026 2.3 km away Rooftop solar Tesco Stores, Coleshill Road - Solar PV panels Approved, not yet built · 330 kW
Feb 2025 2.4 km away Battery storage Maybrook Road - Battery facility Approved, not yet built · 13 MW
Aug 2022 2.5 km away Rooftop solar WHS Plastics, Water Orton Lane - Solar Panels Approved, not yet built · 1 MW
Dec 2024 2.8 km away Road and street works within 1 km 3 permitted works running now or planned.
Standard Langley Drive, Birmingham Disconnection or alteration of supply · National Grid Electricity Distribution (West Midlands) · Some carriageway incursion
Nov 2026 to Nov 2026 550 m away Minor Heath Way, Birmingham Highway improvement works · BIRMINGHAM CITY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 900 m away Minor Kempson Road, Birmingham Permanent reinstatement · VIRGIN MEDIA · No carriageway incursion
Oct 2026 to Oct 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2020 8.7 km away Decided decided Oct 2013 21.3 km away Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 25.3 km away Decided decided Feb 2026 26.2 km away Decided decided Jun 2025 28.2 km away Decided decided May 2020 29.9 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Transport HS2: Birmingham Curzon Street station Under construction
under construction 7.3 km away Transport HS2: Interchange station (Solihull) Under construction, near the NEC and Birmingham Airport
under construction 7.9 km away Running nearest: Minsworth Sewage Treatment Works (other, 3.6 km); Coleshill STW (Waste AD) (anaerobic digestion, 5.4 km); Birmingham Bio-Power Plant (energy from waste, 6.1 km); Tyseley ERF (energy from waste, 6.4 km); Packington Generation Plant Phase 3 (landfill gas, 7.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.