What's changing near B35 7NR
Within 2 km, around Castle Vale in Birmingham. Building, planning, schools, transport, prices and crime.
2new homes completed within 2 km, last 2 years
78homes given permission on brownfield sites since 2021
+12.0%like-for-like prices in Castle Vale, 2024 → 2025 (council +3.3%)
+15%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- Planning permissionAug 2024
500 m away - School closed
School closed: Sunflower Meadow Farm SchoolOther independent special school, other independent special school (closure)
Mar 2024
1.8 km away - Planning permissionMar 2024
1.8 km away - Planning permission
Permission for 1 home274 Eachelhurst Road, Sutton Coldfield, Birmingham, B76 1EP (full planning permission) Mar 2024
2.0 km away - Planning permission
Permission for 2 homesLand adjacent to, Kimal, Old Kingsbury Road, Sutton Coldfield, Birmingham (full planning permission) Nov 2023
950 m away - New school
New school: Sunflower Meadow Farm SchoolOther independent special school, other independent special school
Mar 2023
1.8 km away - Planning permissionAug 2022
200 m away - Planning permissionMay 20221.8 km away
0homes extended 2021–2025
3since energy certificates began (2008)
0in B35 7NR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
190hours of spills in 2025 between them (typical neighbourhood: about 36)
24spill events counted
- Severn Trent Water
Minworth Sewage Treatment Worksinto River Tame24 spills, 190 hours in 2025
1.3 km away - Severn Trent Water
Castle Vale - Kingsbury Road (Cso)into Plants Brook0 spills, 0 hours in 2025
600 m away - Severn Trent Water
Tyburn - 128 Hansons Bridge Road Sointo Plants Brook0 spills, 0 hours in 2025
1.4 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
73 planned, approved or being built and 5 running (61 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Premier Paper, Midpoint Park - Solar PanelsApproved, not yet built · 260 kW
Jan 2026
550 m away - Rooftop solar
Hozelock, Midpoint Park - Solar PanelsPlanning application in · 160 kW
May 2026
700 m away - Battery storage
Maybrook Road - Battery facilityApproved, not yet built · 13 MW
Aug 2022
1.2 km away - Rooftop solar
Park Hall Academy, Water Orton Road - Solar PanelsApproved, not yet built · 300 kW
Jun 2026
1.3 km away - Rooftop solar
WHS Plastics, Water Orton Lane - Solar PanelsApproved, not yet built · 1 MW
Dec 2024
1.7 km away - Energy from waste
Fort Industrial Park (Castle Bromwich)Approved, not yet built · 10 MW
Jun 2016
1.8 km away - Rooftop solar
Buzz Bingo, Kingsbury Road - Solar panelsApproved, not yet built · 500 kW
Oct 2023
1.9 km away - Battery storage
Wishaw Lane, Sutton Coldfield - Battery Energy StoragePlanning application in · 50 MW
Dec 2024
2.5 km away - Battery storage
Lichfield Road, Watton Lane - Battery StorageApproved, not yet built · 50 MW
Mar 2024
3.2 km away - Rooftop solar
Fort Shopping Park, Fort Parkway - Solar PV PanelsApproved, not yet built · 2 MW
Sept 2023
3.3 km away
Road and street works within 1 km
3 permitted works running now or planned.
- Standard
Stornoway Road, BirminghamUtility asset works · National Grid Electricity Distribution (West Midlands) · Some carriageway incursion
Oct 2026 to Oct 2026
350 m away - Minor
High Street, BirminghamHighway improvement works · BIRMINGHAM CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
450 m away - Minor
Kingsbury Road, BirminghamHighway improvement works · BIRMINGHAM CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2020
9.6 km away - Decideddecided Oct 2013
22.9 km away - Decided
M54 to M6 Link RoadHighways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022
24.9 km away - Decideddecided Feb 2026
26.2 km away - Decideddecided Jun 2025
26.6 km away - Decideddecided May 2020
29.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
- Transport
HS2: Birmingham Curzon Street stationUnder construction
under construction
8.6 km away - Transport
HS2: Interchange station (Solihull)Under construction, near the NEC and Birmingham Airport
under construction
8.7 km away
Running nearest: Minsworth Sewage Treatment Works (other, 2.1 km); Coleshill STW (Waste AD) (anaerobic digestion, 4.5 km); Birmingham Bio-Power Plant (energy from waste, 7.7 km); Tyseley ERF (energy from waste, 8.0 km); Packington Generation Plant Phase 3 (landfill gas, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.