Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
175hours of spills in 2025 between them (typical neighbourhood: about 36)
121spill events counted
Severn Trent Water
Kings Norton - Rear 24 Ebury Rd Csointo River Rea36 spills, 75 hours in 2025
1.2 km away
Severn Trent Water
King'S Norton-Wychall Lane Csointo River Rea22 spills, 36 hours in 2025
550 m away
Severn Trent Water
Woodbrook Road Csointo Griffins Brook7 spills, 24 hours in 2025
1.6 km away
Severn Trent Water
Allenscroft Road Csointo River Rea22 spills, 23 hours in 2025
1.5 km away
Severn Trent Water
King'S Norton-Pershore Rd South Csointo River Rea33 spills, 16 hours in 2025
600 m away
Severn Trent Water
Bridge Piece Csointo River Rea1 spills, 2 hours in 2025
1.8 km away
Severn Trent Water
Charlotte Rd/Ashtree Rd Jct Csointo Trib Of River Rea0 spills, 0 hours in 2025
1.4 km away
Severn Trent Water
Church Rd Csointo Trib Of The Bourn0 spills, 0 hours in 2025
M42 Junction 6 ImprovementHighways · Junction 6 of the M42 motorway, close to the National Exhibition Centre (NEC)
decided May 2020 15.7 km away
Pre-application
Arrow Valley SolarGenerating Stations · approximately 4km south west of Alcester within the administrative area of Wychavon District Council, Stratford-on-Avon District Council and Redditch Borough Council.
application due April 2027 26.6 km away
Decided
M54 to M6 Link RoadHighways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone
decided Apr 2022 27.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Transport
HS2: Birmingham Curzon Street stationUnder construction
under construction 8.0 km away
Transport
HS2: Interchange station (Solihull)Under construction, near the NEC and Birmingham Airport
under construction 15.3 km away
The longer view
Like-for-like prices in Cotteridge: +22% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.5% in two years.
Permission for 82 homesPrimrose Estate Phase 3, Land off Foyle Road and Land off Redditch Road, Kings Norton, Birmingham, B38 (full planning permission)
Aug 2021 1.9 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
Battery storage
Lowlands Farm - Battery StorageApproved, not yet built · 50 MW
Sept 2024 6.4 km away
Rooftop solar
Formans Road, Tyseley - Solar PanelsApproved, not yet built · 350 kW
Apr 2023 6.7 km away
Running nearest: Tyseley ERF (energy from waste, 8.1 km); Birmingham Bio-Power Plant (energy from waste, 8.3 km); Sandy Lane Generation Plant (landfill gas, 9.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.