Country England and Wales › Region West Midlands › Council Birmingham › Neighbourhood Pype Hayes Park › Postcode B24 0JA What's changing near B24 0JA Within 2 km, around Pype Hayes Park in Birmingham. Building, planning, schools, transport, prices and crime.
78 new homes completed within 2 km, last 2 years
337 homes given permission on brownfield sites since 2021
+2.1% like-for-like prices in Pype Hayes Park, 2024 → 2025 (council +3.3%)
-12% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New school New school: TJY Academy Other independent special school, other independent special school
Sept 2026 1.5 km away New homes 5 new homes completed flats · Aug 2026
Aug 2026 1.4 km away New homes 53 new homes completed flats · Sep 2025
Sept 2025 1000 m away New homes 10 new homes completed houses · Feb 2025 – Jun 2025
Jun 2025 1.4 km away Planning permission Permission for 1 home 274 Eachelhurst Road, Sutton Coldfield, Birmingham, B76 1EP (full planning permission) Mar 2024 1.4 km away Planning permission Mar 2024 1.4 km away Planning permission Permission for 1 home Land adjacent, 27 Wylde Green Road , Sutton Coldfield, Birmingham, B72 1HD (full planning permission) Feb 2024 1.9 km away Planning permission Feb 2024 900 m away Planning permission Jan 2024 1.6 km away 17 homes extended 2021–2025, typically adding 29 m²
34 since energy certificates began (2008)
0 in B24 0JA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
1 hours of spills in 2025 between them (typical neighbourhood: about 36)
2 spill events counted
Severn Trent Water Spitfire Road Cso into Tributary Of River Tame 2 spills, 1 hours in 2025
1.7 km away Severn Trent Water Tyburn - 128 Hansons Bridge Road So into Plants Brook 0 spills, 0 hours in 2025
1.7 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 75 planned, approved or being built and 5 running (102 MW between them). Those within 5 km are on the map above.
Rooftop solar Buzz Bingo, Kingsbury Road - Solar panels Approved, not yet built · 500 kW
Oct 2023 1.7 km away Battery storage Maybrook Road - Battery facility Approved, not yet built · 13 MW
Aug 2022 2.1 km away Rooftop solar Mercedes benz garage, Bromford Lane - Solar PV System Approved, not yet built · 290 kW
Mar 2023 2.3 km away Energy from waste Fort Industrial Park (Castle Bromwich) Approved, not yet built · 10 MW
Jun 2016 2.4 km away Rooftop solar Fort Shopping Park, Fort Parkway - Solar PV Panels Approved, not yet built · 2 MW
Sept 2023 2.4 km away Rooftop solar Premier Paper, Midpoint Park - Solar Panels Approved, not yet built · 260 kW
Jan 2026 3.0 km away Rooftop solar Hozelock, Midpoint Park - Solar Panels Planning application in · 160 kW
May 2026 3.1 km away Rooftop solar Gravelly Industrial Park, Units 59 & 60 - Solar Panels Approved, not yet built · 280 kW
May 2024 3.7 km away Rooftop solar Stargate Business Park, Cuckoo Road, Unit 2 - Solar PV Panels Approved, not yet built · 150 kW
Feb 2026 3.9 km away Rooftop solar Altitude, Deykin Avenue - Solar Panels Approved, not yet built
Oct 2022 4.0 km away Road and street works within 1 km 8 permitted works running now or planned.
Standard Chester Road, Birmingham Highway improvement works · BIRMINGHAM CITY COUNCIL · Lane closure
Nov 2026 to Nov 2026 150 m away Standard Chester Road, Birmingham Highway improvement works · BIRMINGHAM CITY COUNCIL · Lane closure
Oct 2026 to Oct 2026 150 m away Standard Old Bell Road, Birmingham Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026 850 m away Standard Rowden Drive, Birmingham Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026 850 m away Standard Beechmount Drive, Birmingham Utility asset works · CADENT GAS LIMITED · Two-way signals
Oct 2026 to Oct 2026 900 m away Minor Grange Road, Birmingham Highway improvement works · BIRMINGHAM CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 350 m away Minor Orphanage Road, Birmingham Highway improvement works · BIRMINGHAM CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 800 m away Minor Sutton Road, Birmingham Utility repair and maintenance works · SEVERN TRENT WATER · No carriageway incursion
Oct 2026 to Oct 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2020 12.1 km away Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 22.0 km away Decided decided Oct 2013 22.4 km away Decided decided Jun 2025 26.5 km away Decided decided May 2020 26.7 km away Decided decided Feb 2026 29.2 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Transport HS2: Birmingham Curzon Street station Under construction
under construction 7.2 km away Transport HS2: Interchange station (Solihull) Under construction, near the NEC and Birmingham Airport
under construction 11.2 km away Running nearest: Minsworth Sewage Treatment Works (other, 4.4 km); Coleshill STW (Waste AD) (anaerobic digestion, 7.4 km); Birmingham Bio-Power Plant (energy from waste, 7.7 km); Tyseley ERF (energy from waste, 8.1 km); Bustleholme Substation (battery storage, 9.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.