Country England and Wales › Region West Midlands › Council Birmingham › Neighbourhood Edgbaston North › Postcode B15 3XD What's changing near B15 3XD Within 2 km, around Edgbaston North in Birmingham. Building, planning, schools, transport, prices and crime.
211 new homes completed within 2 km, last 2 years
778 homes given permission on brownfield sites since 2021
-0.2% like-for-like prices in Edgbaston North, 2024 → 2025 (council +3.3%)
-34% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New school New school: George Dixon Primary Academy sponsor led, primary
planned Jan 2027 700 m away New school Sept 2026 1.5 km away New homes 23 new homes completed houses · May 2026 – Jul 2026
Jul 2026 1.9 km away New homes 23 new homes completed houses · Dec 2025 – Jun 2026
Jun 2026 1.9 km away New homes 5 new homes completed houses · Jun 2026
Jun 2026 1.4 km away New homes 42 new homes completed 9 flats, 33 houses · Oct 2025 – May 2026
May 2026 2.0 km away New homes 14 new homes completed flats · Mar 2026
Apr 2026 1.2 km away New homes 5 new homes completed flats · Mar 2026
Mar 2026 1.1 km away New homes 30 new homes completed houses · Sep 2025 – Dec 2025
Dec 2025 1.9 km away New homes 5 new homes completed flats · Dec 2025
Dec 2025 950 m away New homes 20 new homes completed houses · Nov 2025
Dec 2025 1.9 km away New homes 9 new homes completed houses · Oct 2025
22 homes extended 2021–2025, typically adding 30 m²
51 since energy certificates began (2008)
1 in B15 3XD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 10 storm overflows within 2 km
40 hours of spills in 2025 between them (typical neighbourhood: about 36)
57 spill events counted
Severn Trent Water Anderson Road Cso into Chad Brook 20 spills, 14 hours in 2025
900 m away Severn Trent Water Cape Hill Combined Sewer Overflow into Hockley Brook 10 spills, 12 hours in 2025
1.8 km away Severn Trent Water Stanhope Road/Davison Road Jct Cso into Thimblemill Brook 9 spills, 8 hours in 2025
2.0 km away Severn Trent Water Grove Street Cso into Hockley Brook 3 spills, 3 hours in 2025
1.9 km away Severn Trent Water Moorpool Avenue Cso into Tributary Of Chad Brook 3 spills, 2 hours in 2025
850 m away Severn Trent Water Harborne - High Street/Station Road (Cso) into Chad Brook 7 spills, 1 hours in 2025
1.0 km away Severn Trent Water High Street Combined Sewer Overflow into Chad Brook 3 spills, 0 hours in 2025
1.0 km away Severn Trent Water High Street/Bull Street Cso into Chad Brook 0 spills, 0 hours in 2025
1.0 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 89 planned, approved or being built and 9 running (199 MW between them). Those within 5 km are on the map above.
Rooftop solar First Steps Nursery, Waterloo Road - Solar Panels Approved, not yet built · 300 kW
Feb 2024 1.7 km away Rooftop solar Ash And Lacy, Alma Street - Photovoltaic Solar Panels Approved, not yet built · 240 kW
Oct 2024 2.6 km away Rooftop solar Cambrian Wharf, Brindley Drive - Student Accommodation Approved, not yet built · 190 kW
Jan 2026 2.9 km away Rooftop solar Guru Nanak Gurdwara, High Street - Solar Panels Approved, not yet built · 210 kW
Nov 2024 3.0 km away Rooftop solar Devonshire Infant & Junior Academies, Auckland Road - Solar Panels Approved, not yet built · 260 kW
Jul 2025 3.1 km away Battery storage New Summer Street, Hockley - Battery Storage Facility Approved, not yet built
Feb 2024 3.9 km away Rooftop solar Lansing Linde Creighton Limited, Dartmouth Road - Solar Panels Approved, not yet built · 200 kW
Jan 2026 3.9 km away Rooftop solar Holyhead Road - Roof Mounted Solar PV solar panels Approved, not yet built · 210 kW
Jul 2024 4.1 km away Rooftop solar Holyhead Road - Solar PV Panels Planning application in · 400 kW
May 2026 4.2 km away Rooftop solar West Bromwich Albion Football Club - Solar Panels Approved, not yet built · 700 kW
Sept 2025 4.2 km away Road and street works within 1 km 5 permitted works running now or planned, 1 of them major.
Major Portland Road, Birmingham Utility repair and maintenance works · SEVERN TRENT WATER · Road closure
Oct 2026 to Oct 2026 500 m away Minor Hagley Road, Birmingham Utility repair and maintenance works · Transport for West Midlands - Passenger Transport Executive · Lane closure
Oct 2026 to Oct 2026 450 m away Minor Rotton Park Road, Birmingham Utility repair and maintenance works · SEVERN TRENT WATER · Two-way signals
Nov 2026 to Nov 2026 500 m away Minor Portland Road, Birmingham Utility asset works · BT · Two-way signals
Nov 2026 to Nov 2026 650 m away Minor Carisbrooke Road, Birmingham Highway improvement works · BIRMINGHAM CITY COUNCIL · Road closure
Nov 2026 to Nov 2026 700 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2013 13.5 km away Decided decided May 2020 16.6 km away Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 21.7 km away Decided decided May 2020 26.4 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Transport HS2: Birmingham Curzon Street station Under construction
under construction 4.3 km away Transport HS2: Interchange station (Solihull) Under construction, near the NEC and Birmingham Airport
under construction 15.9 km away Running nearest: DPD Distribution Centre (rooftop solar, 5.6 km); Oldbury (energy from waste, 7.3 km); Birmingham Bio-Power Plant (energy from waste, 7.4 km); Tyseley ERF (energy from waste, 7.6 km); Edwin Richards Landfill Scheme (landfill gas, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.