What's changing near B14 7NS
Within 2 km, around Kings Heath Park & Stirchley East in Birmingham. Building, planning, schools, transport, prices and crime.
68new homes completed within 2 km, last 2 years
252homes given permission on brownfield sites since 2021
-1.6%like-for-like prices in Kings Heath Park & Stirchley East, 2024 → 2025 (council +3.3%)
-8%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
39 new homes completedflats · Apr 2026
Apr 2026
1.0 km away - New homes
9 new homes completedflats · Feb 2025 – Jan 2026
Jan 2026
1.4 km away - New homes
8 new homes completedflats · Jan 2026
Jan 2026
1.5 km away - New homes
10 new homes completedflats · Mar 2025
Mar 2025
1.2 km away - Planning permissionMay 2024
1.7 km away - Planning permissionMar 2024
1.6 km away - Planning permissionMar 2024
1.1 km away - Planning permissionJan 2024
1.3 km away - Planning permissionJan 2024
1.7 km away - Planning permission
17homes extended 2021–2025, typically adding 34 m²
25since energy certificates began (2008)
1in B14 7NS itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
144hours of spills in 2025 between them (typical neighbourhood: about 36)
97spill events counted
- Severn Trent Water
Kings Norton - Rear 24 Ebury Rd Csointo River Rea36 spills, 75 hours in 2025
1.7 km away - Severn Trent Water
Selly Oak Moor Green Lane Csointo River Rea29 spills, 26 hours in 2025
1000 m away - Severn Trent Water
Allenscroft Road Csointo River Rea22 spills, 23 hours in 2025
1.2 km away - Severn Trent Water
Dads Lane Combined Sewer Overflowinto River Rea10 spills, 20 hours in 2025
1000 m away - Severn Trent Water
Charlotte Rd/Ashtree Rd Jct Csointo Trib Of River Rea0 spills, 0 hours in 2025
1.2 km away - Severn Trent Water
Ardencote Road 24 Csointo Tributary Of Chinn Brook0 spills, 0 hours in 2025
1.8 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
65 planned, approved or being built and 2 running (40 MW between them). Those within 5 km are on the map above.
- Battery storage
Fordhouse Lane - Battery Energy Storage SystemApproved, not yet built · 20 MW
Aug 2023
800 m away - Rooftop solar
Selly Park Girls School, Selly Park Road - Solar PV PanelsApproved, not yet built · 270 kW
Apr 2026
1.3 km away - Rooftop solar
BPL Engineering, Catesby Park - Solar PanelsApproved, not yet built · 160 kW
Jan 2023
3.1 km away - Rooftop solar
Formans Road, Tyseley - Solar PanelsApproved, not yet built · 350 kW
Apr 2023
4.2 km away - Rooftop solar
Greet Primary School, Percy Road - Solar PanelsApproved, not yet built · 220 kW
Jul 2024
4.3 km away - Rooftop solar
Cole Valley, Westwood Avenue - Solar PanelsApproved, not yet built · 780 kW
Apr 2023
4.4 km away - Rooftop solar
West Heath Hospital, Rednal Road - Solar PanelsApproved, not yet built · 180 kW
Mar 2026
4.7 km away - Rooftop solar
Bellfield Junior School, Vineyard Road - Solar PanelsApproved, not yet built · 170 kW
Apr 2024
4.7 km away - Rooftop solar
Shenley Court Secondary School, Shenley Lane - Solar PV PanelsApproved, not yet built · 180 kW
Aug 2023
4.8 km away - Rooftop solar
Golden Hillock Road, Sparkbrook - Solar PanelsApproved, not yet built · 730 kW
Feb 20244.9 km away
Road and street works within 1 km
11 permitted works running now or planned.
- Minor
Priory Road, BirminghamHighway improvement works · BIRMINGHAM CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
50 m away - Minor
Norton View, BirminghamHighway improvement works · BIRMINGHAM CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
350 m away - Minor
Lewis Road, BirminghamHighway improvement works · BIRMINGHAM CITY COUNCIL · Road closure
Nov 2026 to Nov 2026
400 m away - Minor
Grove Road, BirminghamHighway improvement works · BIRMINGHAM CITY COUNCIL · Road closure
Nov 2026 to Nov 2026
400 m away - Minor
Newlands Road, BirminghamRemedial works · CADENT GAS LIMITED · No carriageway incursion
Nov 2026 to Nov 2026
500 m away - Minor
Grove Road, BirminghamRemedial works · CADENT GAS LIMITED · No carriageway incursion
Nov 2026 to Nov 2026
600 m away - Minor
Avenue Road, BirminghamHighway improvement works · BIRMINGHAM CITY COUNCIL · Road closure
Nov 2026 to Nov 2026
650 m away - Minor
Pineapple Close, BirminghamHighway improvement works · BIRMINGHAM CITY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
650 m away - Minor
Hough Road, BirminghamHighway improvement works · BIRMINGHAM CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
700 m away - Minor
Fordhouse Lane, BirminghamHighway improvement works · BIRMINGHAM CITY COUNCIL · Multi-way signals
Major infrastructure projects within 30 km
- Decideddecided Oct 2013
9.7 km away - Decideddecided May 2020
13.5 km away - Decided
M54 to M6 Link RoadHighways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022
27.3 km away - Pre-application
Arrow Valley SolarGenerating Stations · approximately 4km south west of Alcester within the administrative area of Wychavon District Council, Stratford-on-Avon District Council and Redditch Borough Council. application due April 2027
28.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
- Transport
HS2: Birmingham Curzon Street stationUnder construction
under construction
5.9 km away - Transport
HS2: Interchange station (Solihull)Under construction, near the NEC and Birmingham Airport
under construction
13.0 km away
Running nearest: Tyseley ERF (energy from waste, 5.6 km); Birmingham Bio-Power Plant (energy from waste, 5.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.